Installation

9.Place front panel on machine, loosely attach four bottom screws. Connect door switch harness to switch in new location. Install door assembly and four front panel side screws loosely. Refer to Figure 9.

10.Check lint panel fit, adjusting front panel up or down as required. Tighten four front panel side screws to maintain position of front panel for proper lint panel clearance.

11.Remove lint panel. Fully tighten bottom screws on front panel.

12.Reinstall top screws and guide lugs.

13.Adjust door catch if necessary to allow

7 – 15 pounds pull (0.48 – 1.03 bar) at center of handle.

14.Reinstall control assembly using mounting screws.

15.Reinstall control panel and lint panel.

IMPORTANT: Restore power to tumbler and test for proper operation of loading door switch. Tumbler should not start with door open; an operating tumbler should stop when door is opened.

NOTE: If machine is converted back to right hand hinge operation, the door switch harness must be rerouted and rebundled with the lint panel switch harness. Wire ties must be used to secure harnesses. Wire ties (Part No. 55881) can be ordered from RSPC.

1

4

3

2

 

TMB1997N

1Switch (New location)

2Plug (New location)

3Door Assembly

4Side Screw

Figure 9

22

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

M414905