! | Main Bearing Cover |
| |
I |
|
i 1
Fi$. | F&. 948 |
*Fig. 9-4-9 shows an example of the methods to measure the side clearance of the crank-
shaft. In this case, it is measured by measuring the clearance between the pro- cessing face of the crankcase and adjusting color. As the packing is installed on the processing face of the crankcase, determine the clearance by taking into consideration the thickness of this packing which is 0.22 mm.
Fig.
Dial Gauge
Processing Face of Crankcase
/
9-4-6 INTAKE VALVE AND EXHAUST VALVE
Scrape off deposits such as carbon gum from the valves, valve seat, intake/exhaust ports, and valve guide.
Note: If the valve face is worn, replace the valve with a new one.
Note: If the clearance between the valve guide and valve stem is too large, re- place the valve guide with a new one provided by the supplier.
While replace@, pull out the valve guide by using a pull block and a pull bolt and then
Valve Guide Puller
Fig. 9410