Sun Microsystems 2000E installation manual Watch the terminal screen for any POST error messages

Models: 2000E

1 54
Download 54 pages 35.54 Kb
Page 38
Image 38
6.Watch the terminal screen for any POST error messages.

Power supply maintenance should be scheduled. 2

6.Watch the terminal screen for any POST error messages.

At the conclusion of testing, POST automatically configures the system, omitting any devices that have failed diagnostics. After POST ends, the system will boot using the new configuration.

If the middle front panel LED remains lit after the system has booted, the system has failed POST.

If you system has two power supplies and one fails, the system will continue to operate. If POST, OBP or the operating system detects the power supply failure, a warning message similar to the one below will be displayed to the console:

Power supply maintenance should be scheduled.

Note – POST does not test drives or internal parts of SBus cards. To test these devices, run OpenBoot PROM (OBP) diagnostics manually after the system has booted. Refer to the OpenBoot Command Reference manual for instructions.

7.To start POST again, or if the system hangs, press the reset switch on the back of the front panel.

See Figure 2-21.

2-22

SPARCserver 2000E Power Supply Installation ManualApril 1995

Page 38
Image 38
Sun Microsystems 2000E Watch the terminal screen for any POST error messages, Power supply maintenance should be scheduled