5.Configure the preinstalled Solaris™ operating system or install a supported operating system of your choice. For details, refer to one of the following:
■“Configuring the Preinstalled Solaris 10 Operating System” on page 36
■Sun Fire X4100/X4100 M2 and X4200/X4200 M2 Servers Operating System Installation Guide,
■Sun Fire X4100/X4100 M2 and X4200/X4200 M2 Servers Windows Operating System Installation Guide,
6.Customize your server as needed. For details, refer to the “System Management” section of the online information system or the Integrated
Installing the Server Into a Rack With Optional Slide Rails
To install your server in a
■
■Rack horizontal opening and unit vertical pitch conforming to ANSI/EIA
■Distance between front and rear mounting planes between 610 mm and 915 mm (24 inches to 36 inches).
■Clearance depth (to front cabinet door) in front of front rack mounting plane at least 25.4 mm (1 inch).
■Clearance depth (to rear cabinet door) behind front rack mounting plane at least 800 mm (31.5 inches) or 700 mm (27.5 inches) without cable management arm.
■Clearance width (between structural supports and cable troughs) between front and rear mounting planes at least 456 mm (18 inches).
Note – Although the Sun Fire X4100/X4100 M2 server is pictured in the illustrations in this section, these procedures also apply to the Sun Fire X4200/X4200 M2 server.
Caution – Always load equipment into a rack from the bottom up so that it will not become
2 Sun Fire X4100/X4100 M2 and X4200/X4200 M2 Servers Installation Guide • May 2007