Final Preparation

INSTALLATION Continued

B.If it is a new installation have the gas authorities check meter size and piping to assure that the unit is supplied with necessary amount of gas pressure required to operate the unit..

C.If it is additional or replacement equipment have the gas authorities check pressure to make certain that existing meter and piping will supply fuel to the unit with no more than 0..15 Kpa pressure drop..

D.Make certain new piping and connections have been made in a clean manner and have been purged so that piping compound, chips, etc.. will not clog pilots, valves or burners.. Use pipe joint compound approved for natural and liquefied petroleum gases..

NOTE: Gas pressure should be checked when the unit is installed and all other equipment on the same line is on.. The operating gas pressure must be the same as that specified on the rating plate.. If necessary, pressure adjustment may be made at the pressure regulator supplied with the appliance..

The appliance and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system where pressures are in excess of 1/2 PSIG (3..45kPa..)

Final Preparation

NOTE: Your new range has a plastic coating to help protective the finish from scratches during shipping.. This protective plastic film should be pealed off prior to starting the range..

TESTING AND ADJUSTMENT

Testing

All fittings and pipe connections must be tested for leaks.. Use approved gas leak detectors, soap solution or equivalent, checking over and around all the fittings and pipe connections.. DO NOT USE A FLAME! Accessibility to all gas lines and fittings require that valve panel(s) lower front panel(s), and/or oven rack(s) be removed.. It may be necessary to remove, or at least raise and securely prop griddle(s), hot top(s), and/or top grate(s).. All parts removed, (including fasteners), should be stored safely for re- installation..

1.Be sure that all valves and thermostats are in the “OFF” position..

2.Turn on the main gas supply valve.. Light all top section pilots..

3.Leak test all valves and fittings as described at the beginning of this section.. Correct any leaks as required and recheck..

4.Light the oven pilot..

5.Set the oven thermostat to maximum.. Leak test all valves and fittings as described at the beginning of this section.. Correct any leaks as required and recheck..

6.Shut off all valves and set thermostat dials to “OFF” or lowest position.. All units are tested and adjusted at the factory, however, burners and pilots should be checked upon installation and adjusted if necessary..

CAUTION: Gas will flow to the top section burners even if top section pilots are not lit.. Gas will not be interrupted.. It is the responsibility of the operator to confirm the proper ignition of each burner as it is turned on.. Should ignition fail to occur 4 seconds after turning a burner on, turn the burner off, wait 5 minutes, and try again..