12 - 17
12. OPTIONS AND AUXILIARY EQUIPMENT
(3) Outline dimension drawing
UVW
D100(3.94) D
(0.2)5
C
E
G
F
2.3(0.09)
Terminal block
Screw : M3.5 Screw : M4
B
A
5
(0.2)
E
13 14
E
(GND) ab
[Unit: mm]
([Unit: in])
Tightening torque: 1.2 [N m](10 [lb in])
Tightening torque: 0.8 [N m](7 [lb in])
Dynamic brake A B C D E F G Mass
[kg]([Ib])
Connection
wire [mm2]
DBU-11K 200
(7.87) 190
(7.48) 140
(5.51) 20
(0.79) 5
(0.2) 170
(6.69) 163.5
(6.44) 2 (4.41) 5.5
DBU-15K, 22K 250
(9.84) 238
(9.37) 150
(5.91) 25
(0.98) 6
(0.24) 235
(9.25) 228
(8.98) 6 (13.23) 5.5
POINT
Configure up a sequence which switches off the contact of the brake unit
after (or as soon as) it has turned off the servo on signal at a power failure
or failure.
For the braking time taken when the dynamic brake is operated, refer to
Section 11.3.
The brake unit is rated for a short duration. Do no t use it for high duty.
When the dynamic brake is used, the power supply voltage is restricted as
indicated below.
3-Phase 170 to 220VAC/50Hz
3-Phase 170 to 242VAC/60Hz