ASSEMBLY
MAIN FRAME MOUNTING
It may be necessary to raise the front of the tractor slightly to allow the main frame to be slid under the tractor. With an overhead hoist or floor jack, slide the frame under the tractor from the right hand side. Raise the frame up to the correctly matching mounting holes. Install the capscrews and all other hardware as shown in the main frame parts section. Remove the capscrews one at a time and apply a
HUSCO VALVE PLUMBING (SCV ONLY UNITS)
The tractor ports used are on the selective control valve (SCV). The SCV is located between the right arm of the three point hitch and the axle. The pressure port is located the closest to the axle. The excessive flow port is right next to the pressure port. And the return port is located on the adjacent face. Refer to the image below as a guide.
NOTE: To use the pressure port a 3/8 NPT pipe plug(B) must be inserted into the port(C) - (refer to the illustration below and the Parts Section). Remove the plugs covering the ports of the SCV ports. After the plug is removed, use a wrench to tighten the plug(B) securely.
SELECTIVE CONTROL VALVE (SCV)
When the pressure port is active, install the adapters in their ports. The hose from the pressure port goes to the “P” port of the husco valve. Next the return hose from the lift valve goes back to the “T” port on the selective control valve. Plumb the power beyond hose from the “PB” port on the husco valve to the “EF” port on the SCV. See the parts pages for placement and the hardware used.
Assembly Section