Preparation 1 - Turning Power ON

Turning power ON

1 Press the power switch to “ ” (ON) side.

The equipment starts warming itself up. The warm-up time takes approx. 25 seconds. When the warm-up has finished, the [START] lamp is lit to show that the equipment is ready for copying.

If you press the [START] button with an original placed while the warm-up is still continu- ing, copying automatically starts after it has finished. This is called auto job start. When the job is reserved, the [START] lamp blinks to show you the current status.

However, this function cannot be accessed while “0” is blinking on the LED display (approx. 15 seconds).

2 Key in the access code if the equipment is managed under the access code function.

Key in the 3-digit access code, and then press the [START] button. Then the equipment is ready for copying.

yIf the access code function is enabled, press the [FUNCTION CLEAR] button after any operation has been finished to prevent unauthorized use of the equipment.

yFor the details of the access code setting, ask your service technician.

Turning power OFF

Press the power switch to “ ” (OFF) side.

Preparation 1 - Turning Power ON 27

Page 29
Image 29
Toshiba DP-1810 Preparation 1 Turning Power on, Turning power on, Turning power OFF, Press the power switch to on side