e-STUDIO281c/351c/451c ADJUSTMENT June 2005 © TOSHIBA TEC
3 - 2
3.2 Adjustment of the Auto-Toner Sensor
When the developer material is replaced, adjust the auto-toner sensor in the following procedure.
(1) Install the cleaner and developer unit.
Note: Note:
Do not install the toner cartridge.
(2) While pressing [0] and [5] simultaneously, turn the power ON. The following message will be dis-
played.
(3) Key in a code and press the [START] button.
(4) Adjustment for “K” (Magnetometric sensor control)
The following message will be displayed approx. 2 minutes later.
Code 200: All developer materials 201: Developer material Y 202: Developer material M
203: Developer material C 204: Developer material K 206: Developer material Y, M, C
100% A A3
TEST MODE
[0] [5]
[POWER]
100% 200 A3
TEST MODE
(Code)[
START]
K: xxxV
K: zzzV
(B)
(C)
(A)
(B): Current sensor voltage (V)
(C): No display
(A): Target values (V) for adjustment reference
voltage