E658130

6.1.Program example for reading the inverter status

Example 1 shows a ladder logic to read the inverter status.

Y30 of the output unit is turned on when inverter of station 2 is forward running

X0

X0F

X1

SW80.1

 

 

( M0 )

Check the ready of the station 2

 

 

 

 

 

 

 

 

 

 

M0

X1020

 

 

 

 

( Y30 )

Turn on the relay of output

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

unit (Y30)

 

 

 

 

 

 

 

 

 

 

 

 

[END]

 

 

 

 

 

 

 

 

 

Example

 

 

 

 

 

 

 

 

 

 

 

 

 

Remote input

b15

 

 

 

b8

b7

 

 

 

 

 

b0

 

 

 

 

 

 

 

 

 

 

 

Station1

RX0 to RXF

0

0

0 0 0 0

* * 0

00 0 00 0 00

0

00

0

00

00

10

RX10 to RX1F

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Station 2

RX20 to RX2F

 

 

 

 

 

[Inverter

 

 

 

 

 

RX30 to RX3F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inverter status

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b0: Forward running

 

 

 

 

 

 

 

 

 

 

 

 

b1: Reverse running

 

 

 

 

 

 

 

 

 

 

 

 

b2: Output terminal 1

 

 

 

 

 

 

 

 

 

 

 

 

b3: Output terminal 2

 

 

 

 

 

 

 

X0:

Module error

 

 

 

b4: Output terminal 3

 

 

 

 

 

 

 

 

 

 

b5: Failure FL

 

 

 

 

 

 

 

 

X1:

Host data link status

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X0F:

Module ready

 

 

 

b6: PI control OFF

 

 

 

 

 

 

 

SW80.1: Station 2 ready

 

 

 

b7: Acceleration/deceleration pattern selection (1 or 2)

 

 

 

 

 

 

b8: Emergency stop

 

 

 

 

 

 

 

 

 

 

 

 

b9: Coast stop

 

 

 

 

 

 

 

 

 

 

 

 

 

b10: Alarm

 

 

 

 

 

 

 

 

- 38 -

Page 39
Image 39
Toshiba E6581830 instruction manual Program example for reading the inverter status, X0F, End