RAV-SM561AT-E, RAV-SM801AT-E

5 EVACUATING

Compound pressure gauge

Pressure gauge

–101kPa

 

(–76cmHg)

Manifold valve

 

Handle Lo

Handle Hi

 

(Keep fully closed)

Charge hose

Charge hose

(For R410A only)

(For R410A only)

 

 

Vacuum pump adapter

 

for counter-flow prevention

 

(For R410A only)

 

Vacuum

 

pump

Packed valve (Gas side)

Service port (Valve core (Setting pin))

Valve unit

 

 

 

Flare nut

 

 

 

 

 

 

 

Stopper

Charge cap

Charge port

Valve rod

 

*1. Use the vacuum pump, vacuum pump adapters, and gauge manifold referring to the manuals attached to each tool before using them. For the vacuum pump, check oil is filled up to the specified line of the oil gauge.

*2. While the air is purged, check again that the connecting port of charge hose, which has a projection to push the valve core, is firmly connected to the charge port.

Valve handling precautions

Open the valve stem or the handle until it strikes the stopper. It is unnecessary to apply further force.

Securely tighten the cap with a torque wrench.

Cap tightening torque

 

Ø6.4

14 to 18 N•m (1.4 to 1.8 kgf•m)

 

 

 

Valve size

Ø9.5

33 to 42 N•m (3.3 to 4.2 kgf•m)

 

 

Ø12.7

33 to 42 N•m (3.3 to 4.2 kgf•m)

 

 

 

 

 

Ø15.9

33 to 42 N•m (3.3 to 4.2 kgf•m)

 

 

 

Charge port

14 to 18 N•m (1.4 to 1.8 kgf•m)

 

 

 

– 12 –

Page 12
Image 12
Toshiba RAV-SM1101AT-E, RAV-SM1401AT-E, RAV-SM801AT-E, RAV-SM561AT-E installation manual Valve size, Charge port