RAV-SM1101AT-E, RAV-SM1401AT-E

Compound pressure gauge

–101kPa (–76cmHg)

Handle Lo

Charge hose (For R410A only)

Service port

(Valve core (Setting pin))

Packed valve at gas side

Pressure gauge

Manifold valve

Handle Hi

(Keep fully closed)

Charge hose (For R410A only)

Vacuum pump adapter

for counter-flow prevention (For R410A only)

Vacuum pump

Handle position

Handle

Closed completely

Opened fully

*1. Use the vacuum pump, vacuum pump adapters,

and gauge manifold referring to the manuals attached to each tool before using them.

For the vacuum pump, check oil is filled up to the specified line of the oil gauge.

How to open the valve

Valve unit

Handle

Pull out the handle and using cutting pliers, etc. turn it counterclockwise by 90˚. (Open fully)

Charge port

Flare nut

Valve unit

Push in handle.

Charge port

Flare nut

*2. While the air is purged, check again that the connecting port of charge hose, which has a projection to push the valve core, is firmly con- nected to the charge port.

Valve handling precautions

Open the valve stem or the handle until it strikes the stopper. It is unnecessary to apply further force.

Securely tighten the cap with a torque wrench.

Cap tightening torque

Valve size

 

Ø9.5

33 to 42 N•m (3.3 to 4.2 kgf•m)

 

 

 

 

Ø15.9

20 to 25 N•m (2.0 to 2.5 kgf•m)

 

 

 

 

 

 

Charge port

 

14 to 18 N•m (1.4 to 1.8 kgf•m)

 

 

 

 

– 25 –

Page 25
Image 25
Toshiba RAV-SM1401AT-E, RAV-SM1101AT-E, RAV-SM801AT-E, RAV-SM561AT-E How to open the valve, Handle position