Toshiba S2 manual Hardware Overview, Power Supply, Power ON/OFF sequence

Models: S2

1 208
Download 208 pages 8.08 Kb
Page 29
Image 29
6.Power ON/OFF sequence

1 Hardware Overview

1.5 Power Supply

6.Power ON/OFF sequence

When power is turned on or off, the EC starts the power on or off sequence.

?SQ0-4 = power ON sequence

?SQ5-B = power OFF sequence

7.Battery charging control

The EC controls the following.

?The quick charging ON/OFF

?The detection of full charge

8.Detection of the low battery

The EC detects the low battery point by the gas gauge.

?LB10M= The system will be driven by the battery for 12 more minutes.

?

LB0

= The battery won't be able to drive the system after 3 minutes.

?

LB1

= The battery can drive the system only during the suspend process.

?

LB2

= The battery cannot drive the system.

9.New battery installation

When a new battery is installed, the EC communicates with the E2PROM in the battery to read information of the newly installed battery.

10.Battery capacity calculation

The EC reads battery remaining and percentage capacity from the battery through SMBus.

1-20

Tecra A3/S2 Series Maintenance Manual

Page 29
Image 29
Toshiba S2 manual Hardware Overview, Power Supply, Power ON/OFF sequence