Toshiba S2 manual Lid Switch Test, Tests and Diagnostics

Models: S2

1 208
Download 208 pages 8.08 Kb
Page 98
Image 98
3.15 Lid Switch Test

3.15 Lid Switch Test

3. Tests and Diagnostics

3.14 Lid Switch Test

The lid switch test checks the lid function of the unit. When LCD cover closed, the lid should enable to turn off the display.

NOTE: Remember to tune up the volume as “Maximum” before this test starts.

Follow below steps to run this test:

1.Close the LCD cover.

2.Heard 3 “Beep” sound happened during LCD closed.

3.Open the LCD.

Then it will indicate whether the test is passed or failed.

Tecra A3/S2 Series Maintenance Manual

3-23

Page 98
Image 98
Toshiba S2 manual Lid Switch Test, Tests and Diagnostics