
Transition Networks |
3.4 Wiring the Power Inputs
Please follow the steps below to insert the power wire.
1.Insert AC or DC power wires into the contacts 1 and 2 for power 1, or 5 and 6 for power 2.
2. Tighten the
[NOTE] The wire gauge should be in the range 12 ~ 24 AWG.
Technical Support: | International: |