Vulcan-Hart VHX24G5, MHB24G Water Level, Water Inlet Valve manual, Pressure Relief Valve

Models: VHX24G5 VHX24G MHB24G

1 68
Download 68 pages 8.1 Kb
Page 11
Image 11
Energized when Aux LLCO is satisfied and turns ready light (green) ON if high limit pressure switch is closed. Also, K1 allows K3 to be energized when the reset switch is pressed.

VHX SERIES STEAMERS - COMPONENT FUNCTION

Relay Board . . . . . . . . . . . . . . . . . . . Provides a centralized location for wire harness connections and power transfer through board relays (K1-K7) to the steamer controls. Also, provides a condition or component troubleshooting indicator by utilizing seventeen LED’S on the board to represent the status of the condition or component in the operation sequence. For an LED legend, see "RELAY BOARD" under "ELECTRICAL OPERATION". New style controls only.

NOTE: The relay’s below are mounted on the relay board and are not individually replaceable. K1 Relay . . . . . . . . . . . . . . . . . . . . . .

K2 Relay

Energized when high limit pressure switch is closed (high limit pressure

 

condition satisfied). When K1 & K2 are energized, the ready light (green)

 

will be ON.

 

K3 Relay

When Aux LLCO is satisfied and the manual reset switch is activated,

 

K3 is energized. When K3 is energized, turns water error light OFF and

 

allows the ignition sequence to begin. K3 must be energized for ignition

 

sequence to begin.

 

K4 Relay

Energized when K2 contacts are closed and manual reset switch is

 

activated. When K4 is energized, the high pressure light is OFF. When

 

K3 and K4 are both energized, power to the ignition system is supplied.

K5 Relay

Energized when operating conditions are met and reset switch is

 

activated. Provides power to start combustion blower.

K6 Relay

Energized by time delay circuit for approximately 15 seconds. When K6

 

and K7 are energized, power is supplied to the pilot gas valve.

K7 Relay

Energized when pilot voltage (PV) from the ignition module is present.

 

Also used in the time delay circuit.

 

Pilot

Ignites to light the main burner upon a call for heat.

Main Burner

Heats the water in the boiler to generate steam.

 

Water Level

 

 

 

 

Gauge Assembly

Permits a visual confirmation the water level is being maintained in

 

boiler during operation. The correct water level is approximately one

 

visible inch in the glass. The manual valves at the top and bottom of this

 

assembly must be fully open and only closed if the glass tube is

 

damaged.

 

Water Inlet Valve (manual)

The water inlet valve is used to stop water flow to the steamer when the

 

steamer is being serviced. This valve should remain open during normal

 

operation.

 

Inline Water Strainer

A "Y" strainer is installed upstream of the blowdown solenoid valve to

 

prevent foreign matter from becoming lodged in the valve. A strainer

 

(not supplied) should also be installed in the water supply line to prevent

 

foreign matter from becoming lodged in the fill or cold water condenser

 

solenoid valves and to keep unwanted particles out of the system.

Pressure Relief Valve

A mechanical device that opens to relieve steam pressure in the boiler if

 

the pressure exceeds 13 psi.

 

High Pressure Relief Valve

A back-up mechanical device that opens to relieve steam pressure in

 

the boiler if the pressure exceeds 15 psi.

 

Descaler

Hangs below the water level inside the boiler and is used to help control

 

boiler surface scaling. Two descalers are used in each boiler.

Boiler Pressure Gauge

Indicates the amount of steam pressure in the boiler.

Steam Header Assembly

Main steam supply line from the boiler to the steam header inlet in the

 

cooking control compartment.

 

 

 

Page 11 of 68

 

F24700 (October 2001)

 

 

 

Page 11
Image 11
Vulcan-Hart VHX24G5, MHB24G Water Level, Water Inlet Valve manual, High Pressure Relief Valve, Boiler Pressure Gauge