6
Tools Needed:
Level
Bottom Section
Before installing the bottom section, the weather seal (may not be included) must be installed (see Preparing the Opening on page 10)
Center the bottom section in the door opening. Level section using wooden shims (if necessary) under the bottom section.
weather seal
door opening level
SECTION |
|
BOTTOM | wooden shims |
(if necessary)
7
Tools Needed:
3/16” Drill Bit
Power Drill
7/16” Socket
Driver
Tape Measure
Level
Vertical Track
IMPORTANT: The tops of the vertical tracks must be level from side to side. If the bottom section was shimmed to level it. The vertical track on the shimmed side, must be raised the height of the shim.
Position the left hand vertical track assembly over the rollers of the bottom section. Make sure the counterbalance cable is located between the rollers and the door jamb. Drill 3/16” pilot holes for the lag screws. Loosely fasten
cable drum fLAGANGLE
5/16” x
LAG SCREWS
CABLE
VERTICAL
TRACK
ASSEMBLY
vertical track
BOTTOM SECTION
5/8” roller
LAG | LAG | |
SCREW | ||
SCREW | ||
locations | ||
locations | ||
|
jamb brackets and flagangle to the jamb using 5/16” x
JAMB
BRACKET SECTION BOTTOM
12r qi flagangle 15r qi flagangle
quick install jamb bracket
LAG SCREW
locations
| lag |
12r & 15r Fully | screw |
Adjustable flagangle
14
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at