Wayne-Dalton 9600 installation instructions Stacking Sections, Top Brackets

Models: 9600

1 40
Download 40 pages 4.99 Kb
Page 15
Image 15
Stacking Sections

8

Stacking Sections

 

 

 

 

 

 

 

 

 

Tools Needed:

NOTE: For door section identification see

 

 

 

 

Power Drill

page 4.

 

 

 

 

 

 

 

 

 

7/16” Socket

NOTE: Make sure hinges are flipped down,

 

 

 

 

Driver

when stacking another section on top.

 

 

 

 

 

Place rollers in hinge tubes of the second

 

 

 

 

 

section (lock section). With assistance,

 

 

 

 

 

lift second section and guide rollers into

 

 

 

 

 

the vertical tracks. Keep sections aligned

 

 

 

 

 

and fasten hinges to connect the sections

 

 

 

 

 

using 1/4”-14 x 5/8” self tapping screws.

 

 

 

 

 

Repeat for other section(s) except top

 

 

 

 

 

section.

 

 

 

 

 

IMPORTANT: Push & hold the hinge

 

 

 

 

 

leaf against section while securing

 

 

(3) 1/4”-14 X 5/8” SELF TAPPING

INSTALLATION

 

with 1/4”-14 x 5/8” self tapping

 

 

 

 

 

SCREWS

 

 

 

 

 

screws. End Hinges have (2) screws

 

 

 

 

 

 

 

 

 

and Intermediate hinges have (3)

 

 

 

 

 

screws.

 

 

 

 

 

NOTE: Install lock at this time (sold

(2) 1/4”-14 X 5/8”

 

 

 

SELF TAPPING SCREWS

 

 

 

separately) see instructions in OPTIONAL

 

 

 

end hinges (left hand shown, right

 

 

 

SIDELOCK INSTALLATION on page 32.

intermediate hinges

 

 

hinge symmetrically opposite)

 

 

 

 

 

9

Top Brackets

TOP SECTION

1st Set

 

 

 

 

 

 

 

 

 

 

 

2nd set

(4) 1/4” - 14 x 5/8”

 

Tools Needed:

To install the L-shaped top brackets,

 

 

SELF TAPPING

 

 

 

SCREWS

 

Power Drill

align the top holes in the top bracket

TOP BRACKET BASE

 

 

base with the second set of holes in the

 

 

7/16” Socket

 

 

 

 

endcap.

 

 

 

 

Driver

 

 

 

 

 

 

Fasten using (4) 1/4” - 14 x 5/8” self

 

 

 

 

 

tapping screws. Secure the top bracket

 

 

(2) 1/4” - 20 x 5/8”

 

 

slide to the bracket base loosely using

 

 

CARRIAGE BOLTS

 

 

 

 

 

 

 

(2) 1/4” - 20 x 5/8” carriage bolts and

 

 

 

 

 

(2) 1/4” - 20 flanged hex nuts. The

TOP BRACKET SLIDE

(2) 1/4” - 20

 

 

bracket will be tightened and adjusted

 

 

 

 

in Step 16. Insert rollers into top bracket

 

 

FLANGED HEX

 

 

 

 

NUTS

 

 

slide. Repeat for other side.

TOP SECTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ROLLER

 

TOP SECTION

TOP BRACKET SLIDE

15

Please Do Not Return This Product To The Store. Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your

local yellow pages/business listings or go to the Find a Dealer section online at www.Wayne-Dalton.com

Page 15
Image 15
Wayne-Dalton 9600 installation instructions Stacking Sections, Top Brackets