Inverter/Charger Installation
Wiring the Inverter to the XW Power Distribution Panel
Important: If a XW Conduit Box is installed, communication and Battery Temperature Sensor cables must run through the raceway at the rear of the XW Conduit Box. Before making AC and DC connections, route all communication and Battery Temperature Sensor cables through the raceways. The raceways becomes more difficult to access after all AC and DC wiring is completed.
Grounding the DC System
The inverter’s chassis ground bar (see Figure
A
See Table
B B
See Table
A
Actual ground requirements may vary.