182
T h e P a t t e r n J o b s
14 : Time StretchLenghtens or shortens the specified track by a specified percentage
without affecting tempo or pitch.
First beat.
First measure. Last measure.
Last beat.
The “TR” parameter selects the track to be affected by the Time
Stretch job: D1, D2, PC, BA, C1, C2, C3, C4.
The “M” parameters above the graphic bar are used to specify the
first measure:beat and last measure:beat of the range to be modified.
The “Time” parameter specifies the percentage by which the time
is to be lengthened or shortened: “50%” … “200%”. The gate time of
notes in the specified track and measures will also be changed in propor-
tion to this setting.
After setting the parameters as required press [ENTER] to execute
the Time Stretch job. The metronome icon will appear on the display while
the data is being processed, then “Completed” will appear briefly when
the job is done. Press the [EXIT] key to return to the job list, or a mode key
to go directly to the selected mode.
■
NOTE
• If the specified track is shortened, the phrase of the track will play repeatedly to fill
the pattern length.
• If the specified track is lengthened, the exceeding part of the phrase will be cut off.