Briggs & Stratton 01938-0 manual Installation Procedures

Page 4

Briggs & Stratton Power Products Home Generator

Installation Manual

INSTALLATION PROCEDURES

Required Specialty Tools/Equipment

Two 48” lengths of 1” OD pipe (NOT conduit)

Hole punches for 16ga steel

Torque screwdriver, 5 to 50 inch-pound range

Unpacking Precautions

The unit is shipped bolted to its mounting pad, ready for installation. Avoid damage from dropping, bumping, collision, etc. Store and unpack carton with the proper side up, as noted on the shipping carton.

CAUTION

Installing the 15A fuse could cause the engine to start.

Observe that the 15 Amp fuse has been removed from the control panel for shipping.

DO NOT install this fuse until all plumbing and wiring has been completed and inspected.

Delivery Inspection

After removing the carton, carefully inspect the Home Standby Generator for any damage that may have occurred during shipment.

IMPORTANT: If loss or damage is noted at time of delivery, have the person(s) making delivery note all damage on the freight bill and affix his signature under the consignor's memo of loss or damage. If loss or damage is noted after delivery, separate the damaged materials and contact the carrier for claim procedures. Missing or damaged parts are not warranted.

Shipment Contents

The Home Standby Generator is supplied with:

Home Standby Generator

Pre-attached mounting pad

One 24” flexible hook-up hose

Installation and start-up manual (P/N 192385GS)

Owner’s manual(P/N 192384GS)

Illustrated parts list manual (P/N 193208GS for model 01815 or P/N 193918GS for model 01938)

Product warranty sheet (P/N 190881GS)

Installation checklist (P/N 190840GS)

Three access door keys

Four lifting hole plugs

Oil fill spout

Touch-up paint

One spare 15A fuse

Diagnostic LED kit (diode/plate/decal/pin connectors (2))

Approved Transfer Switches

The Home Standby Generator should be used ONLY with the following UL approved Transfer Switches. Connection to any other transfer switch not listed below will void your equipment warranty.

50A Nema 1 enclosure, BSPP Model 01917

50A Nema 3R enclosure, BSPP Model 01918

100A Nema 3R enclosure, BSPP Model 01813

100A Nema 3R enclosure w/ main line disconnect, BSPP Model 01928

200A Nema 3R enclosure, BSPP Model 01814

200A Nema 3R enclosure w/ main line disconnect, BSPP Model 01929

Home Standby Generator Location

Before installing generator, consult with homeowner and convey the following guidelines which may affect the desired location.

Generator Clearances

The generator enclosure must be at least 5 ft. (152 cm) from structures having combustible walls and/or other combustible materials. Leave at least 3 ft. (92 cm) all around the enclosure including the roof, for adequate cooling, generator maintenance and servicing.

Place generator in a well ventilated area, which will allow for removal of deadly exhaust gas. DO NOT install generator where exhaust gas could accumulate and enter inside or be drawn into a potentially occupied building. Ensure exhaust gas is kept away from any windows, doors, ventilation intakes or other openings that can allow exhaust gas to collect in a confined area (Figure 1). Prevailing winds and air currents should be taken into consideration when positioning generator.

General Location Guidelines

DANGER

Running generator gives off carbon monoxide, an odorless, colorless, poison gas.

Breathing carbon monoxide will cause nausea, fainting or death.

Operate generator ONLY outdoors.

Keep exhaust gas from entering a confined area through windows, doors, ventilation intakes or other openings.

4

Image 4
Contents Installation and Start-Up Manual Customer Responsibilities Installer Responsibilities Table of ContentsEquipment Description Safety Rules Amp fuse Before working on the equipmentInstallation Procedures Fuel and Electrical Inlet Dimensions Lifting the GeneratorPort Conduit AttachmentAccess Doors BatteryInsert DoorTo Install an Access Door Installation Manual To Remove an Access DoorGaseous Fuel System From Fuel To Home StandbyFuel Consumption Fuel Pipe Sizing10ft 15ft 20ft 30ft 40ft 50ft 60ft 70ft 80ft 90ft 100ft LoadKnow Your System Control Board Volt DC, .5 Amp Output Internal power supplyRemote LED Output Fault Detection System To install the remote LED panelGenerator AC Connection System Grounding the SystemBattery Connection Before Initial START-UPSystem Control Panel Engine OilTo configure the fuel system for LP use Do not dispose of battery in a fireFuel System Selection Fuel Supply SystemInstall the 15 Amp fuse in the control panel Engine AdjustmentInitial START-UP no Load Engine Cool-down Timer Adjustment NutAutomatic Operation Sequence Utility Voltage Dropout SensorInstallation Inspection Setting Exercise TimerTo perform the Set Exercise procedure Physical Properties Butane Propane Natural Gas Fuel Comparison ChartWithdrawal Rate 32F 20F 10F 30F 40F Tabla DE Contenido Descripción DEL EquipoResponsabilidades DEL Cliente Responsabilidades DEL InstaladorAdvertencia Conserve Estas Instrucciones Instrucciones DE SeguridadPrecaución Procedimientos DE Instalación PeligroDimensiones de la Entrada para Electricidad y Combustible Elevación del GeneradorConector de la tubería De combustible 13.5Para Puertas de AccesoEntrada de Combustible Para Retirar una Puerta de Acceso Sistema DE Combustible Gaseoso AdvertenciaPara Instalar una Puerta de Acceso Figura 19 Manómetro Instalado Transitoriamente El Generador Doméstico viene preparado de fábrica paraDimensiones de la Cañería de Combustible Consumo de CombustibleModelo Gas Natural Vapor de PL Gas Natural peso específico =Conozca LA Tarjeta DE Control DE SU Sistema Sistema de Conexión de c.a. del Generador Conexión a Tierra del SistemaInterconexiones del Circuito de Control Sistema de Detección de FallasAntes DEL Arranque Inicial DEL Motor Panel de Control del SistemaAceite de Motor Conexión de la BateríaPara configurar el sistema de combustible para uso de LP Selección DEL Sistema DE CombustibleSistema de Suministro de Combustible Instale el fusible de 15 Amperios en el panel de controlInstale el fusible de 15 Amperios en el panel de control Arranque Inicial SIN CargaFije el interruptor AUTO/OFF/MANUAL en la posición Del Regulador Ajuste del MotorCargue el generador al valor nominal de gas natural Secuencia DE Operación Automática Configuración DEL Temporizador DE PrácticaInspección Posterior a LA Instalación Propiedades físicas Butano Propano Gas natural Cuadro de Comparación de CombustiblesTasa de consumo 32F 20F 10F 30F 40F Responsabilités DE Linstallateur Guide dInstallationTable DES Matières Description DE LéquipementVeuillez Conserver CES Instructions Règles DE Sécurité AvertissementProcédures Dinstallation Soulèvement de la Génératrice EmplacementConnecteur de tuyauterie De combustible 91 cm Tuyau ici Tuyau fourni par linstallateur Portes dAccèsPour Pour enlever une porte daccèsPour installer une porte daccès LE Système DE Combustible Gazeux AvertissementManomètre Temporaire Installé Le groupe électrogène a été réglé en usine pourConsommation de Combustible Grosseur du Tuyau de CombustibleModèle Gas Naturel Vapeur PL Gaz Naturel densité = 0,65Sortie de panneau DEL à distance Interconnexions du Circuit de Commande Tableau de Commande du SystèmeSystème de Branchement C.A. de la Génératrice Mise à la Masse du SystèmeHuile à Moteur Avant LE Démarrage Initial DU MoteurBranchement de la Batterie Sélection DU Système DE Combustible Démarrage Initial SansSystème dAlimentation en Combustible Réglez linterrupteur AUTO/OFF/MANUAL sur AutoRéglage du Moteur Écrou de RéglageDu Régulateur Chargez la génératrice au débit de gaz naturel nominalSéquence DE Fonctionnement Automatique Vérification InstallationRéglage DE LA Minuterie DE Cycle Dexercice Charte de Comparaison des Combustibles Propriétés physiques Butane Propane Gaz naturelDensité 31,26 Poids† Indice d’octane Recherche
Related manuals
Manual 48 pages 38.43 Kb