Install the unit outdoors ONLY.

Place the unit in a prepared location that is flat and has provisions for water drainage.

Install the unit where air inlet and outlet openings will not become obstructed by leaves, grass, snow, etc. If prevailing winds will cause blowing or drifting, you may need to construct a windbreak to protect the unit.

Install the generator as close as possible to the Transfer Switch to reduce the length of wiring and conduit.

Install the generator as close as possible to the fuel supply to reduce length of pipes.

IMPORTANT: Laws or local codes may regulate the distance to the fuel supply.

The Home Standby Generator is shipped already attached to its mounting pad. Unless mandated by local code, a concrete slab is not required.

If mandated by local code, construct a concrete slab at least 3 inches thick and 6 inches longer and wider than the unit. Attach unit to slab with 1/4” diameter (minimum) masonry anchor bolts long enough to retain the unit.

Fuel and Electrical Inlet Dimensions

Figure 2, below, depicts the location of the fuel piping connector. Also shown is the recommended location for punching holes for attaching the power conduit.

Figure 1 — Home Standby Generator Clearances

Exhaust

Port

Lifting the Generator

The generator weighs more than 375 pounds. Proper tools, equipment and qualified personnel should be used in all phases of handling and moving the generator.

CAUTION! DO NOT lift unit by roof as damage to generator will occur.

Two 48” lengths of 1” O.D. pipe (supplied by the installer) are required to lift the generator manually. Insert pipes through the lifting holes located near the unit’s base, as shown in Figure 3 (next page).

Figure 2 — Generator Fuel and Conduit Attachment Locations, Oil Service Side of Unit

Fuel Piping

Connector

4.5”

Recommended

 

Conduit Attachment

3/4” NPT

Area

13.5”

5

Image 5
Contents Installation and Start-Up Manual Equipment Description Table of ContentsCustomer Responsibilities Installer Responsibilities Amp fuse Before working on the equipment Safety RulesInstallation Procedures Lifting the Generator Fuel and Electrical Inlet DimensionsPort Conduit AttachmentBattery Access DoorsInsert DoorGaseous Fuel System Installation Manual To Remove an Access DoorTo Install an Access Door To Home Standby From FuelFuel Pipe Sizing Fuel Consumption10ft 15ft 20ft 30ft 40ft 50ft 60ft 70ft 80ft 90ft 100ft LoadRemote LED Output Volt DC, .5 Amp Output Internal power supplyKnow Your System Control Board To install the remote LED panel Fault Detection SystemGenerator AC Connection System Grounding the SystemBefore Initial START-UP Battery ConnectionSystem Control Panel Engine OilDo not dispose of battery in a fire To configure the fuel system for LP useFuel System Selection Fuel Supply SystemInitial START-UP no Load Engine AdjustmentInstall the 15 Amp fuse in the control panel Adjustment Nut Engine Cool-down TimerAutomatic Operation Sequence Utility Voltage Dropout SensorTo perform the Set Exercise procedure Setting Exercise TimerInstallation Inspection Withdrawal Rate 32F 20F 10F 30F 40F Fuel Comparison ChartPhysical Properties Butane Propane Natural Gas Descripción DEL Equipo Tabla DE ContenidoResponsabilidades DEL Cliente Responsabilidades DEL InstaladorPrecaución Conserve Estas Instrucciones Instrucciones DE SeguridadAdvertencia Peligro Procedimientos DE InstalaciónElevación del Generador Dimensiones de la Entrada para Electricidad y CombustibleConector de la tubería De combustible 13.5Entrada de Combustible Puertas de AccesoPara Para Instalar una Puerta de Acceso Sistema DE Combustible Gaseoso AdvertenciaPara Retirar una Puerta de Acceso El Generador Doméstico viene preparado de fábrica para Figura 19 Manómetro Instalado TransitoriamenteConsumo de Combustible Dimensiones de la Cañería de CombustibleModelo Gas Natural Vapor de PL Gas Natural peso específico =Conozca LA Tarjeta DE Control DE SU Sistema Conexión a Tierra del Sistema Sistema de Conexión de c.a. del GeneradorInterconexiones del Circuito de Control Sistema de Detección de FallasPanel de Control del Sistema Antes DEL Arranque Inicial DEL MotorAceite de Motor Conexión de la BateríaSelección DEL Sistema DE Combustible Para configurar el sistema de combustible para uso de LPSistema de Suministro de Combustible Instale el fusible de 15 Amperios en el panel de controlFije el interruptor AUTO/OFF/MANUAL en la posición Arranque Inicial SIN CargaInstale el fusible de 15 Amperios en el panel de control Cargue el generador al valor nominal de gas natural Ajuste del MotorDel Regulador Inspección Posterior a LA Instalación Configuración DEL Temporizador DE PrácticaSecuencia DE Operación Automática Tasa de consumo 32F 20F 10F 30F 40F Cuadro de Comparación de CombustiblesPropiedades físicas Butano Propano Gas natural Guide dInstallation Responsabilités DE LinstallateurTable DES Matières Description DE LéquipementAvertissement Veuillez Conserver CES Instructions Règles DE SécuritéProcédures Dinstallation Connecteur de tuyauterie De combustible 91 cm EmplacementSoulèvement de la Génératrice Portes dAccès Tuyau ici Tuyau fourni par linstallateurPour Pour enlever une porte daccèsLE Système DE Combustible Gazeux Avertissement Pour installer une porte daccèsLe groupe électrogène a été réglé en usine pour Manomètre Temporaire InstalléGrosseur du Tuyau de Combustible Consommation de CombustibleModèle Gas Naturel Vapeur PL Gaz Naturel densité = 0,65Sortie de panneau DEL à distance Tableau de Commande du Système Interconnexions du Circuit de CommandeSystème de Branchement C.A. de la Génératrice Mise à la Masse du SystèmeBranchement de la Batterie Avant LE Démarrage Initial DU MoteurHuile à Moteur Démarrage Initial Sans Sélection DU Système DE CombustibleSystème dAlimentation en Combustible Réglez linterrupteur AUTO/OFF/MANUAL sur AutoÉcrou de Réglage Réglage du MoteurDu Régulateur Chargez la génératrice au débit de gaz naturel nominalRéglage DE LA Minuterie DE Cycle Dexercice Vérification InstallationSéquence DE Fonctionnement Automatique Propriétés physiques Butane Propane Gaz naturel Charte de Comparaison des CombustiblesDensité 31,26 Poids† Indice d’octane Recherche