Briggs & Stratton 01938-0 & 01815-0 manual Automatic Operation, Servicing the System

Page 13

Briggs & Stratton Power Products Home Generator

Operator’s Manual

AUTOMATIC OPERATION

To select automatic operation, do the following:

1.Set the service disconnect or main distribution panel circuit breaker that sends utility voltage to the transfer switch to ON.

2.Set the generator’s main circuit breaker to its ON position.

3.Set the AUTO/OFF/MANUAL switch to AUTO.

Servicing the System

To service system:

1.Set the AUTO/OFF/MANUAL switch to OFF.

2.Set the generator’s main circuit breaker to its OFF position.

3.Utility voltage is present. Disconnect power before servicing by removing the two 2 Amp fuses from the transfer switch.

CAUTION

With the switch set to AUTO, the engine may crank and start at any time without warning. Such automatic starting normally occurs when utility source voltage drops below a preset level or during the normal exercise cycle.

To prevent possible injury that might be caused by such sudden starts, always set the AUTO/OFF/MANUAL switch to OFF.

Remove the 15 Amp fuse before working on or around the generator or transfer switch.

Checking Automatic Operation

To check the system for proper automatic operation, proceed as follows:

1.Turn OFF the service disconnect or main distribution panel circuit breaker sending power to the automatic transfer switch.

The engine will crank and start once the utility voltage drops out and the sensor has timed out. Let the system go through its entire automatic operation sequence.

2.With the generator output supplying its loads, turn ON the service disconnect or main distribution panel circuit breaker that supplies utility power to the Automatic Transfer Switch.

3.The automatic transfer switch will transfer loads back to the utility power after 5 minute minimum run time and utility is restored.

4.The generator will run for an additional one minute for engine cool down, then shut down.

NOTE: If generator does not shut down after 10 minutes, put AUTO/OFF/MANUAL switch to OFF and contact your installer or local service center.

This completes the test procedures for automatic operation.The Home Standby Generator will now start automatically when utility power is lost and will supply power to the transfer switch.

Setting Exercise Timer

The Home Standby Generator is equipped with an exercise timer that will start and exercise the system once every seven days. During this exercise period, the unit runs for approximately 20 minutes and then shuts down. Electrical load transfer DOES NOT occur during the exercise cycle (unless an utility power outage occurs).

A switch on the control panel is labeled “Set Exercise” (depicted on page 10).The specific day and the specific time of day this switch is pressed is programmed into the control board memory.This date and time is then used to automatically initiate the system exercise cycle.

To perform the Set Exercise procedure:

1.Choose the day and time you want your Home Standby Generator to exercise.

2.On that day and time, set the AUTO/OFF/MANUAL switch to OFF.

3.Press and hold down the “Set Exercise” switch for two seconds.

4.Set the AUTO/OFF/MANUAL switch to AUTO. “Set Exercise” is complete.

For example, if you press the “Set Exercise” switch on Sunday morning at 10:00 AM, the unit will run an exercise cycle the following Sunday at 10:00 AM (+/- 1/2 hour).

NOTE: “Set Exercise” will only work if the unit is in the Automatic mode and this exact procedure is followed.The exerciser does not need to be re-set if the 15 Amp fuse is removed or changed.The exerciser will need to be re-set if the 12 Volt DC battery is disconnected.

If you want to change the day and time the unit exercises, simply perform the “Set Exercise” procedure at the exact weekday and time you want it to take place.

13

Image 13
Contents 10kW / 12kW Rated Table of Contents Hazard Symbols and Meanings Important Safety RulesDo not dispose of battery in a fire Operate generator only outdoorsAmp fuse Before working on the equipment Introduction Installation AssistanceOwner Orientation For the Home OwnerGenerator Location Fuel FactorsHome Standby Generator Location Device Running Watts Essential CircuitsUnpacking Shipment ContentsDelivery Inspection Control Panel see Know Your Home Standby GeneratorFuel Inlet DataKnow Your System Control Panel Switch15 Amp To Remove an Access Door Access DoorsTo Install an Access Door BatteryBefore Initial START-UP Battery ConnectionEngine Oil Gaseous Fuel SystemTo perform the Set Exercise procedure Setting Exercise TimerAutomatic Operation Servicing the SystemFault Detection System Operator’s Manual Low Voltage Generator Oil Temperature HighEngine Fail To Start Low FrequencyTo Clean the Generator Generator MaintenanceWhen Calling the Factory StorageProblem Cause Correction TroubleshootingOperator’s Manual Year Consumer Use Years Years orManual del Operario Tabla DE ContenidoPeligro Instrucciones Importantes DE SeguridadAdvertencia Símbolos de Peligro y SignificadosLos generadores producen un voltaje muy poderoso PrecauciónIntroducción Conserve Estas InstruccionesOrientación Para EL Propietario Asistencia para la instalaciónUbicación del Generador de Reserva Factores Relacionados con el CombustibleUbicación del Generador Distancias Desde el GeneradorPautas Generales para la Ubicación del Generador Circuitos FundamentalesDispositivo Vatiaje de Inspección al Momento de la Entrega DesempaqueContenido de la Caja Selección de los Circuitos FundamentalesConozca SU Generador Doméstico DE Reserva LED de Diagnóstico Interruptor Conozca EL Panel DE Control DEL SistemaPara Retirar una Puerta de Acceso Puertas de AccesoPara Instalar una Puerta de Acceso Tornillo de Bloqueo deConexión de la Batería Antes DEL Arranque InicialAceite de Motor Sistema de Combustible GaseosoOperación Automática Configuración del Temporizador de PrácticaVerificación de la Operación Automática Paro del SistemaMantenimiento El Motor no Arranca Baja TensiónBaja Frecuencia Sobrevelocidad del MotorAlmacenamiento Mantenimiento DEL GeneradorCambio del Aceite del Motor Para Limpiar el GeneradorReparacion DE Averias Notas Garantía Limitada Manuel dUtilisation Table DES MatièresDirectives DE Sécurité Importantes Symboles de Danger et MoyensAvertissement NE touchez PAS les fils dénudés ou les boîtiers Conservez CES Instructions Aide à lInstallationIntroduction Conseils AU PropriétaireEmplacement de la Génératrice Emplacement du Génératrice d’état d’AttenteFacteurs Relatifs au Combustible Dégagement Autour de la GénératriceCircuits Essentiels Directives Générales Concernant lEmplacementAppareil Watts Vérification de la Livraison DéballageContenu de la Boîte Sélection des Circuits EssentielsBatterie FAMILIARISEZ-VOUS Avec Votre Groupe ÉlectrogèneFiltre à air La position normale de fonctionnement est la position Portes dAccès Pour Installer une Porte dAccèsPour Enlever une Porte dAccès Huile à Moteur Avant LE Démarrage InitialBranchement de la Batterie Système de Combustible GazeuxArrêt du Système Fonctionnement AutomatiqueVérification du Fonctionnement Automatique Réglage de la Minuterie du Cycle dExerciceEntretien Le Moteur Ne Démarre Pas Emballement du Moteur Basse TensionSecondes, fait une pause de 15 secondes, se lance durant Basse FréquenceRemisage Entretien DU GénérateurVidange de lHuile Moteur Pour Nettoyer le GénérateurDépannage Remarques Remarques Garantie Limitée