Installation
DC Load Control Mode Wiring
The procedure below is illustrated in Figure 2-25.
To connect the C-Series controller as a DC load controller:
1.Connect a cable from the BAT POSITIVE terminal on the controller to a battery disconnect.
2.Connect the positive battery cable to the battery disconnect.
3.Connect the negative battery cable to the one of the terminals marked COMMON NEGATIVES.
4.Connect a cable between the PV POS/LOAD terminal on the controller and the positive terminal on the DC load.
5.Connect a cable between the controller’s other COMMON NEGATIVES terminal and to the negative terminal of the load.
6.Tighten per torque requirements outlined on page 39. Allow a little slack on the cables within the controller and secure the wiring with strain reliefs.
48 |