Wiring
Terminal Torque Requirements
Once the wires have been installed, torque the terminals as follows. Be careful not to overtighten.
•20
•25
•35
Battery PV+/Load+ Negatives Negatives
Positive (+)
Common to each other
Figure 2-21 DC Connection Terminals
Wire Size and Over-current Protection Requirements
The wiring,
Wiring should be protected from physical damage with conduit or a strain relief clamp. You should pull the temperature sensor cable through the conduit first as the connector may not fit if other wires have been pulled first.
Current Rating
Each model of the