MRV Communications TS800/155, TS700/155, TS700/100, TS700/G user manual Optimal Mounting

Page 29

M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l

Figure 2.1: Optimal Mounting

TereScope at edge of roof so that heat rising from roof surface does not affect beam

Beam path more than 4.5 m (15 ft) above surface to avoid traffic and rising heat.

Figure 2.2: Acceptable Mounting

Figure 2.3 shows an unrecommended TereScope link location because of interference by IR. Notice that the TereScopes are mounted far from the rooftop edges or are too close to the ground.

TereScope not at edge of roof.

Less than 4.5 m (15 ft) between beam path and heat-emitting surface.

TereScope not at edge of roof.

Beam path passes too close to ground. Heat rising causes scintillation. Allow 4.5 m (15 ft) between ground and beam path.

Figure 2.3: Unrecommended Mounting

19

Image 29
Contents UserManual UserManual TableofContents P E N D I Standards Compliance StandardsFCC Notice CE MarkOther Standards MRV  Laser Safety CertificationDisclaimer TrademarksAboutthisUserManual Before Installing SafetyRequirementsServicing Introduction Carefully Read the Entire Manual Before InstallingModels Part Number Description Using the Part Number for OrderingTheProduct Front MRV Back Panel Description TS800/155 Standard Model DS1 Toggles Data Rate DIP switch TS800/155-F Standard Model including Fusion option RF Transceiver Fusion Operation Mode5b TS & Fusion FusionTS700/100 Fast-Ethernet System OFF Auto-negotiation, on Forced MRV Display LEDs,Dry Dry contact Only TS800 Monitoring and Management optionsManagement Copper Connection Typical ConnectionFiber Connection Line of Sight SiteSurveyOrientation Location & RangeConsult Factory in Case of Doubt Optimal Mounting Unacceptable Mounting Mounting Environment & StabilityPage Transmitting through a Window Wall Mounting using JMP and JMB12 shows the arrangement for transmitting through a window Infrastructure PowerData/Signal Cabling Handle the Fibers Very Carefully BenchTest SetupCompatibility Test equipmentTS700/100Fastethernet IR link Bench testDisplay and Results IndicatorsExpected Results Received powerDescription InstallationAccessories TereScope Parts External view Part DescriptionAiming Head Adjustment and Locks Detachment of the TS from the JMP-L Installer Tool Kit JITK-LMounting Standard position a Mounting the accessoriesMounting on the floor Special MountingJMP-L Mounting on a fragile/crumbly wall17 Alignment kit mountedon JMP-L Back view Attachment of the Transceiver TereScope HeadPowering on the TereScope AimingProcedureTransceiver Alignment ProcedureGeneral Tools and EquipmentFine Alignment 13 Position after the horizontal aiming 15a and 6.15b Alignment screws Link Operating Test InstallationCompletionBefore Closing the Rear Door Visual Inspection17 Mounted TereScope Left View Periodic Visits MaintenanceAccuracy should be examined and restored if necessary Appendix a TS700/100 Fast-Ethernet Light TS800/155 high speed Light TS700/G Giga-Light Appendixb Packing box contains AppendixcAppendixd List of the Tools Supplied by MRV Communications Where to usePoints to Remember IntroductionInterference Figure E.3 Active Transmitters Shown Darkened Page Appendixf Effect of Wind on Terescopes FSO Chaining AppendixGIndirect Chaining Use the indoor switch in building C for the chainingFSO products & Chaining Product series No of chained links Appendixh Site survey Installation System failure Appendixi