MRV Communications TS700/155, TS800/155, TS700/100, TS700/G Installer Tool Kit JITK-L, Mounting

Page 44

JITK: Installer Tool Kit

M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l

The Installer Tool Kit (JITK-L)

The JITK-L tool kit includes the work tools required for opening and closing nuts and screws of the TereScope for optimal installation. It is recommended that these tools be used. MRV supplies this tool kit with each TereScope head. In addition to the tool kit, screws are supplied for mounting the JMP-L on a pedestal that is supplied by MRV as an option.

Fig. 5.9: JITK: Installer Tool Kit

Mounting

1- Detachment of the TS from the JMP-L

The TereScope Head, Aiming Head, and JMP-L are shipped connected to one another. Before mounting, in order to make installation on the mounting surface easier, the JMP-L must first be detached and connected to the fixation surface. Next, the TereScope Head and Aiming Head can be mounted.

To detach the JMP-L, screws ‘B’ should be loosened and screws ‘F1’ and ‘G1’ only should be removed. Do not remove the ‘G2’ screws !

G1

B

F1 (x2)

G2 (x2)

Figure 5.10a: Mounting TS on JMP

Figure 5.10b and 5.10c: Screws to be removed G1 and F1

If the TereScope head is to be detached (e.g., for servicing, but we recommend to send the entire unit TS + Aiming head to the manufactory), remove the four ‘G2’ and ‘F2’ screws (Fig 5.11).

34

Image 44
Contents UserManual UserManual TableofContents P E N D I Standards Standards ComplianceFCC Notice CE MarkMRV  Laser Safety Certification Other StandardsDisclaimer TrademarksAboutthisUserManual SafetyRequirements Before InstallingServicing Carefully Read the Entire Manual Before Installing IntroductionModels Part Number Description Using the Part Number for OrderingTheProduct Front MRV Back Panel Description TS800/155 Standard Model DS1 Toggles Data Rate DIP switch TS800/155-F Standard Model including Fusion option Fusion Operation Mode RF TransceiverFusion 5b TS & FusionTS700/100 Fast-Ethernet System OFF Auto-negotiation, on Forced MRV Display LEDs,Dry Dry contact Only TS800 Monitoring and Management optionsManagement Copper Connection Typical ConnectionFiber Connection SiteSurvey Line of SightOrientation Location & RangeConsult Factory in Case of Doubt Optimal Mounting Mounting Environment & Stability Unacceptable MountingPage Wall Mounting using JMP and JMB Transmitting through a Window12 shows the arrangement for transmitting through a window Infrastructure PowerData/Signal Cabling Handle the Fibers Very Carefully Setup BenchTestCompatibility Test equipmentTS700/100Fastethernet Bench test IR linkIndicators Display and ResultsReceived power Expected ResultsDescription InstallationAccessories Part Description TereScope Parts External viewAiming Head Adjustment and Locks Detachment of the TS from the JMP-L Installer Tool Kit JITK-LMounting Mounting the accessories Standard position aSpecial Mounting Mounting on the floorMounting on a fragile/crumbly wall JMP-LAttachment of the Transceiver TereScope Head 17 Alignment kit mountedon JMP-L Back viewAimingProcedure Powering on the TereScopeProcedure Transceiver AlignmentGeneral Tools and EquipmentFine Alignment 13 Position after the horizontal aiming 15a and 6.15b Alignment screws InstallationCompletion Link Operating TestBefore Closing the Rear Door Visual Inspection17 Mounted TereScope Left View Periodic Visits MaintenanceAccuracy should be examined and restored if necessary Appendix a TS700/100 Fast-Ethernet Light TS800/155 high speed Light TS700/G Giga-Light Appendixb Appendixc Packing box containsAppendixd Where to use List of the Tools Supplied by MRV CommunicationsIntroduction Points to RememberInterference Figure E.3 Active Transmitters Shown Darkened Page Appendixf Effect of Wind on Terescopes AppendixG FSO ChainingUse the indoor switch in building C for the chaining Indirect ChainingFSO products & Chaining Product series No of chained links Appendixh Site survey Installation System failure Appendixi