MRV Communications TS700/155, TS800/155, TS700/100, TS700/G user manual P E N D I

Page 4

 

M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l

Data/Signal Cabling

24

For TS700/155, TS700/G, TS800/155, TS800/155-F

24

For TS700/100

25

C H A P T E R 4 - B E N C H T E S T

 

TS700/155, TS800/155, and TS800/155-F

26

TS700/100

 

27

TS100/G

 

28

Display and Results

29

TS700/155, TS800/155, and TS800/155-F

29

TS700/100

 

30

TS700/G

 

30

C H A P T E R 5 - I N S T A L L A T I O N

 

Accessories

 

31

Mounting

 

34

TS Detachement from the JMP-L

34

Mounting the Accessories

35

Special Mounting

36

Attachment of the Transceiver (TereScope Head)

38

C H A P T E R 6 - A I M I N G P R O C E D U R E

 

Powering on the TereScope

39

Transceiver Alignment

40

Coarse Alignment

40

Fine Alignment

41

Link Operating Test

44

Installation Log

44

Installation Completion

44

C H A P T E R 7 - M A I N T E N A N C E

 

Periodic Visits

40

A P P E N D I X

A :

Product specifications

 

A P P E N D I X

B :

Digital Readout vs. Distance

 

A P P E N D I X

C :

Unpacking Instructions for TereScope

 

A P P E N D I X

D :

Tool Kit, Equipment, and Materials

 

A P P E N D I X

E :

TereScope Bench Test Procedure

 

A P P E N D I X

F :

Effect of wind on TereScopes

 

A P P E N D I X

G :

FSO Chaining

 

A P P E N D I X

H :

Installation Log

 

A P P E N D I X I : P o w e r o v e r E t h e r n e t

 

Image 4
Contents UserManual UserManual TableofContents P E N D I Standards Standards ComplianceFCC Notice CE MarkMRV  Laser Safety Certification Other StandardsDisclaimer TrademarksAboutthisUserManual SafetyRequirements Before InstallingServicing Carefully Read the Entire Manual Before Installing IntroductionTheProduct Using the Part Number for OrderingModels Part Number Description Front MRV Back Panel Description TS800/155 Standard Model DS1 Toggles Data Rate DIP switch TS800/155-F Standard Model including Fusion option Fusion Operation Mode RF TransceiverFusion 5b TS & FusionTS700/100 Fast-Ethernet System OFF Auto-negotiation, on Forced MRV Display LEDs,Dry Management Monitoring and Management optionsDry contact Only TS800 Fiber Connection Typical ConnectionCopper Connection SiteSurvey Line of SightOrientation Location & RangeConsult Factory in Case of Doubt Optimal Mounting Mounting Environment & Stability Unacceptable MountingPage Wall Mounting using JMP and JMB Transmitting through a Window12 shows the arrangement for transmitting through a window Data/Signal Cabling PowerInfrastructure Handle the Fibers Very Carefully Setup BenchTestCompatibility Test equipmentTS700/100Fastethernet Bench test IR linkIndicators Display and ResultsReceived power Expected ResultsAccessories InstallationDescription Part Description TereScope Parts External viewAiming Head Adjustment and Locks Mounting Installer Tool Kit JITK-LDetachment of the TS from the JMP-L Mounting the accessories Standard position aSpecial Mounting Mounting on the floorMounting on a fragile/crumbly wall JMP-LAttachment of the Transceiver TereScope Head 17 Alignment kit mountedon JMP-L Back viewAimingProcedure Powering on the TereScopeProcedure Transceiver AlignmentGeneral Tools and EquipmentFine Alignment 13 Position after the horizontal aiming 15a and 6.15b Alignment screws InstallationCompletion Link Operating TestBefore Closing the Rear Door Visual Inspection17 Mounted TereScope Left View Accuracy should be examined and restored if necessary MaintenancePeriodic Visits Appendix a TS700/100 Fast-Ethernet Light TS800/155 high speed Light TS700/G Giga-Light Appendixb Appendixc Packing box containsAppendixd Where to use List of the Tools Supplied by MRV CommunicationsIntroduction Points to RememberInterference Figure E.3 Active Transmitters Shown Darkened Page Appendixf Effect of Wind on Terescopes AppendixG FSO ChainingUse the indoor switch in building C for the chaining Indirect ChainingFSO products & Chaining Product series No of chained links Appendixh Site survey Installation System failure Appendixi