MRV Communications TS700/G, TS700/155, TS800/155, TS700/100 Aiming Head Adjustment and Locks

Page 43

M R V C o m m u n i c a t i o n s , I n c . – I n s t a l l a t i o n M a n u a l

F1

Alignment Kit

L2

G1

E1

Fig. 5.4: Mounting kit

Fig. 5.5: Mounting kit – Top view

 

 

 

 

D

 

 

K

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E2

G2

F2

L1

B

 

 

Fig. 5.6: Mounting kit – Back view

Fig. 5.7:

C

Mounting kit – Side view

Fig. 5.8a

Fig. 5.8b

L1

Fig. 5.8c

Figures 5.7a – 5.7b: Mounting kit – detailed views

AIMING HEAD ADJUSTMENT AND LOCKS:

B:Right-Left (Horizontal) Fine Alignment Screws (2)

C:Up-Down (Vertical) Fine Alignment Screws (2)

D:Fine Vertical Aiming Locking Bolts (2)

E1/E2:

Aiming Lug (2)

F1:

Horizontal Aiming Locking Bolts (after aiming is completed)

F2:

Vertical Aiming Locking Bolt (after aiming is completed) (one on

 

the right side and one on the left side).

G1:

Horizontal Aiming Axis

G2:

Vertical Aiming Axis (two screws – one on each side)

K:Fine Horizontal Aiming Locking Bolts (2)

L1/L2: Aiming anchor (L1 for Horizontal aiming , L2 for Vertical aiming)

33

Image 43
Contents UserManual UserManual TableofContents P E N D I CE Mark StandardsStandards Compliance FCC NoticeTrademarks MRV  Laser Safety CertificationOther Standards DisclaimerAboutthisUserManual Before Installing SafetyRequirementsServicing Introduction Carefully Read the Entire Manual Before InstallingTheProduct Using the Part Number for OrderingModels Part Number Description Front MRV Back Panel Description TS800/155 Standard Model DS1 Toggles Data Rate DIP switch TS800/155-F Standard Model including Fusion option RF Transceiver Fusion Operation Mode5b TS & Fusion FusionTS700/100 Fast-Ethernet System OFF Auto-negotiation, on Forced MRV Display LEDs,Dry Management Monitoring and Management optionsDry contact Only TS800 Fiber Connection Typical ConnectionCopper Connection Location & Range SiteSurveyLine of Sight OrientationConsult Factory in Case of Doubt Optimal Mounting Unacceptable Mounting Mounting Environment & StabilityPage Transmitting through a Window Wall Mounting using JMP and JMB12 shows the arrangement for transmitting through a window Data/Signal Cabling PowerInfrastructure Handle the Fibers Very Carefully Test equipment SetupBenchTest CompatibilityTS700/100Fastethernet IR link Bench testDisplay and Results IndicatorsExpected Results Received powerAccessories InstallationDescription TereScope Parts External view Part DescriptionAiming Head Adjustment and Locks Mounting Installer Tool Kit JITK-LDetachment of the TS from the JMP-L Standard position a Mounting the accessoriesMounting on the floor Special MountingJMP-L Mounting on a fragile/crumbly wall17 Alignment kit mountedon JMP-L Back view Attachment of the Transceiver TereScope HeadPowering on the TereScope AimingProcedureTools and Equipment ProcedureTransceiver Alignment GeneralFine Alignment 13 Position after the horizontal aiming 15a and 6.15b Alignment screws Visual Inspection InstallationCompletionLink Operating Test Before Closing the Rear Door17 Mounted TereScope Left View Accuracy should be examined and restored if necessary MaintenancePeriodic Visits Appendix a TS700/100 Fast-Ethernet Light TS800/155 high speed Light TS700/G Giga-Light Appendixb Packing box contains AppendixcAppendixd List of the Tools Supplied by MRV Communications Where to usePoints to Remember IntroductionInterference Figure E.3 Active Transmitters Shown Darkened Page Appendixf Effect of Wind on Terescopes FSO Chaining AppendixGIndirect Chaining Use the indoor switch in building C for the chainingFSO products & Chaining Product series No of chained links Appendixh Site survey Installation System failure Appendixi