Datacom Systems VS-1200 Serial DB9, Power Switch SFP series, Rear Label BT series, Input Power

Page 16

16

VS-1200 Data Acccess Switch

3.3.1Serial DB9

The SERIAL connector port is a shielded DB9 Female and is cabled to the COM port of any compatible network tool or PC where HyperTerminal software resides. It is the only port that can easily connect the Management PC to set the IP address (default 192.168.1.1) for the first time.

3.3.2Power Switch (SFP series)

The front panel POWER 1, POWER 2 LEDs are illuminated green, respectively, when the DC power switch is depressed ON and DC power is available at both the two rear DC power sockets. Either

POWER 1, POWER 2 LED illuminated red indicates a defective power source and immediate investigation as to the cause is required to insure redundant power integrity.

3.3.3Rear Label (BT series)

DB9 nomenclature, Serial Number (SN) identifier, Media Access Control (MAC) address identifier, input power requirements, certification compliance identifiers and various other information are provided on this rear label.

3.3.4Rear Labeling (SFP series)

Serial Number (SN) identifier, Media Access Control (MAC) address identifier, input power requirements, certification compliance identifiers and various other information are provided on this rear label.

3.3.5Input Power

Two DC input power sockets are provided on the rear panel. The front panel POWER 1 and 2

LEDs are illuminated green, respectively:

(SFP series) - when the DC POWER switch is depressed ON and DC power is available at both the two rear DC power sockets; or

(BT series) - when DC power is available at both the two rear DC power sockets.

Either POWER 1 or 2 LED not illuminated when powered, indicates a defective power source and immediate investigation as to the cause is required to insure redundant power integrity.

Although only one switching AC adapter power supply is required to power the configurable unit, use of a second independent power source is strongly recommended to assure uninterrupted monitoring. Furthermore, connecting the second DC input power socket to a different external power source circuit than the first DC input power source eliminates power as a single point of failure.

© 2009 Datacom Systems Inc

Image 16
Contents USERguide Page Product Description VS-1200 Data Acccess Switch Datacom Systems IncTable of Contents Customer Service Hardware InstallationVS-1200 Series Functional Drawing Application Terms of Use Copyright License Agreement Trademark AttributionProprietary Notice Certifications and MarksSafety Notices and Warnings Overview VS-1200 Series SummaryVS-1200 Series Features and Benefits What Shipped?VS-1200 Series Common Specifications VS-1200 Series Model Specific SpecificationsPower Consumption 12W BTU/h Operating Range Relative Humidity 5 to 90% non-condensingPage VS-1200 Series Front Panels HardwareVS-1210BT/SFP Front Panel Description PowerAny-to-Any Ports Rear Panel Description Management PortPower Switch SFP series Input PowerSerial DB9 Rear Label BT seriesCommand Line Interface CLI Initial ConfigurationBasic Functionality Password Recovery Basic Commands Read Only AccessSET Port Monitor SE PO MO Show Groups SH GR Group Name TAPShow Port Routing SH PO RO SU SET Password SU SE PA Superuser Commands Configuration AccessShow Users SH US # SET IP Subnet Gateway SET Date MmddyySET Time Hhmmss # SE PO MO 3 OFFADD User AD US Delete User Username Serial Port Configuration DB9HyperTerminal TCP/IP Winsock Management Port Configuration RJ45Port Number IP Address Configuration with HyperTerminal IP Address ConfigurationTelnet Accessories Communications HyperTerminal VS-1200 Data Acccess Switch Initial Configuration IP Address Configuration with Telnet Network Connections Accessories Command Prompt Initial Configuration Exercise CLI Setting Ports Initial Configuration # SET Port Monitor 1 from 7,9 # SET Port Monitor 2 from 8,9# SET Port Monitor 5 from # SET Port Monitor 6 from 3,4# SET Port Monitor 7 from # SET Port Monitor 8 fromSmall Form-Factor Plug Module Safety GuidelinesIntallation Prerequisites Installing the SFP Module Removing the SFP ModulePage Power Hardware InstallationAny-to-Any Connection Management Connection VS-1200 Series Functional Drawing VS-1210BT-BT/SFPVS-1204BT VS-1204SFP Gathering the Data HyperTerminal configuration example ApplicationVS-1200 Data Acccess Switch # SET Port Monitor 6 from # SET Port Monitor 4 from# SET Port Monitor 9 from VS-1200 Data Acccess Switch Application # SET Port Monitor 5 from 1,3 # SET Port Monitor 6 from 1,3# SET Port Monitor 7 from 2,4 # SET Port Monitor 8 from 2,4Internet Warranty Customer ServiceLimits of Liability Datacom Systems Inc