Avaya G350 manual Safety labels and security alert labels, Security Alert

Page 10

About this book

Safety labels and security alert labels

4Scroll down to find the latest issue number, and then click the book title that is to the right of the latest issue number.

5On the next page, scroll down and click one of the following options:

PDF Format to download the book in regular PDF format

ZIP Format to download the book as a zipped PDF file.

Safety labels and security alert labels

Observe all caution, warning, and danger statements to help prevent loss of service, equipment damage, personal injury, and security problems. This book uses the following safety labels and security alert labels:

CAUTION:

A caution statement calls attention to a situation that can result in harm to software, loss of data, or an interruption in service.

! WARNING:

A warning statement calls attention to a situation that can result in harm to hardware or equipment. A warning can also indicate the presence of a hazard that could cause personal injury if the hazard is not avoided by following the instructions provided.

! WARNING:

Use an ESD warning to call attention to situations that can result in ESD damage to electronic components.

!DANGER:

A danger statement indicates the presence of a hazard that can result in severe personal injury or death if the hazard is not avoided by following the instructions provided.

!SECURITY ALERT:

A security alert calls attention to a situation that can increase the potential for unauthorized use of a telecommunications system.

10

Installation of the G350 Media Gateway

 

December 2003

Image 10
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway Overview Downloading this book and updates from the WebAbout this book AudienceSafety labels and security alert labels Security AlertTrademarks Related resourcesTechnical assistance Within the USSending us comments Full installation Installation workflowsBefore you start Gathering information Installation of a staged G350Staging Unpacking Site requirements Environmental VerificationRequired equipment Installation of the G350 Media Gateway Mount the G350 chassis Installing the Avaya G350 Media GatewayMounting the G350 in a rack Affixing a mounting bracket to the front of the G350 To attach each mounting bracket to the G350 To mount the G350 in the rackTo affix brackets to the G350 for wall mounting Mounting the G350 on a wallPlacing the G350 on a table To affix the feetCombination limitations Install the media modulesAllocating slots G350 front panel ports and slots Inserting the S8300 Media Server module To insert the S8300 Media Server moduleInserting media modules To insert a media moduleAttach ground conductors Inserting a media moduleGeneral grounding requirements Approved grounds Connect the safety ground To attach the ground wiresConnect power to the G350 To connect power to the G350Installation of the G350 Media Gateway Preparing for configuration Prepare configuration equipmentPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration Connecting the USB modem To connect and enable the modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting an on-site configuration Assist the configurationAssisting a remote configuration Assisting a combined remote and on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connecting devices Connect the networkConnect IP telephones To connect an IP telephoneConnect non-IP telephones and trunks Connecting an analog telephoneTo connect an analog telephone Connecting a DCP telephone To connect a DCP telephoneTo connect an analog trunk Connecting an analog trunkConnecting an E1/T1 trunk To connect an E1/T1 trunkConnecting an Isdn BRI trunk To connect an Isdn BRI trunkInstall circuit protection Over-Voltage and Sneak-Current ProtectionConnect to the Wide Area Network WAN Connecting the G350 to the WANTo connect the WAN to the G350 Connecting an external router to the G350 Install the Coupled Bonding ConductorTo install the CBC Install the Avaya Partner Contact Closure Adjunct To install the contact closureTesting telephones After installationTest the installation Testing trunksRemove the installation equipment LSP failover testingG350 Media Gateway specifications Technical specificationsPower Cord Specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway