Avaya G350 manual Assisting an off-site configuration staging

Page 41

Preparing for configuration

Step 2: Assist the configuration

Assisting an off-site configuration (staging)

The supporting technician will need to connect some devices to test endpoints. Do not connect endpoint devices unless the supporting technician requests you to do so.

Installation of the G350 Media Gateway

41

December 2003

 

Image 41
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway About this book Downloading this book and updates from the WebOverview AudienceSecurity Alert Safety labels and security alert labelsTechnical assistance Related resourcesTrademarks Within the USSending us comments Before you start Installation workflowsFull installation Staging Installation of a staged G350Gathering information Unpacking Environmental Verification Site requirementsRequired equipment Installation of the G350 Media Gateway Mounting the G350 in a rack Installing the Avaya G350 Media GatewayMount the G350 chassis Affixing a mounting bracket to the front of the G350 To mount the G350 in the rack To attach each mounting bracket to the G350Placing the G350 on a table Mounting the G350 on a wallTo affix brackets to the G350 for wall mounting To affix the feetAllocating slots Install the media modulesCombination limitations G350 front panel ports and slots To insert the S8300 Media Server module Inserting the S8300 Media Server moduleTo insert a media module Inserting media modulesInserting a media module Attach ground conductorsGeneral grounding requirements Approved grounds To attach the ground wires Connect the safety groundTo connect power to the G350 Connect power to the G350Installation of the G350 Media Gateway Prepare configuration equipment Preparing for configurationPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration To connect and enable the modem Connecting the USB modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting a remote configuration Assist the configurationAssisting an on-site configuration Assisting a combined remote and on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connect the network Connecting devicesTo connect an IP telephone Connect IP telephonesTo connect an analog telephone Connecting an analog telephoneConnect non-IP telephones and trunks To connect a DCP telephone Connecting a DCP telephoneConnecting an E1/T1 trunk Connecting an analog trunkTo connect an analog trunk To connect an E1/T1 trunkTo connect an Isdn BRI trunk Connecting an Isdn BRI trunkOver-Voltage and Sneak-Current Protection Install circuit protectionTo connect the WAN to the G350 Connecting the G350 to the WANConnect to the Wide Area Network WAN To install the CBC Install the Coupled Bonding ConductorConnecting an external router to the G350 To install the contact closure Install the Avaya Partner Contact Closure AdjunctTest the installation After installationTesting telephones Testing trunksLSP failover testing Remove the installation equipmentPower Cord Specifications Technical specificationsG350 Media Gateway specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway