Contents
| • Step 6: Install the Coupled Bonding Conductor | 51 |
| • Step 7: Install the Avaya Partner Contact Closure Adjunct | 52 |
5 | After installation | 53 |
| • Step 1: Test the installation | 53 |
| Testing telephones | 53 |
| Testing trunks | 53 |
| LSP failover testing | 54 |
| • Step 2: Remove the installation equipment | 54 |
A | Technical specifications | 55 |
| • G350 Media Gateway specifications | 55 |
| • Power Cord Specifications | 55 |
| Index | 57 |
Installation of the G350 Media Gateway | 7 |
December 2003 |
|