Avaya manual Connect power to the G350, To connect power to the G350

Page 31

Installing the Avaya G350 Media Gateway

Step 4: Connect power to the G350

Step 4: Connect power to the G350

After you have mounted the G350, installed the media modules, and attached grounding conductors, you can connect power to the G350.

To connect power to the G350:

1Connect the power cable to the power connector on the G350 back panel.

2Plug the power cable into a mains socket. The G350 is now powered. The PWR LED on the front panel lights. The CPU LED lights up if the firmware is running. At least one LED on each media module lights up initially and then goes off after about 20 seconds.

Installation of the G350 Media Gateway

31

December 2003

 

Image 31
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway Audience Downloading this book and updates from the WebAbout this book OverviewSecurity Alert Safety labels and security alert labelsWithin the US Related resourcesTechnical assistance TrademarksSending us comments Full installation Installation workflowsBefore you start Gathering information Installation of a staged G350Staging Unpacking Environmental Verification Site requirementsRequired equipment Installation of the G350 Media Gateway Mount the G350 chassis Installing the Avaya G350 Media GatewayMounting the G350 in a rack Affixing a mounting bracket to the front of the G350 To mount the G350 in the rack To attach each mounting bracket to the G350To affix the feet Mounting the G350 on a wallPlacing the G350 on a table To affix brackets to the G350 for wall mountingCombination limitations Install the media modulesAllocating slots G350 front panel ports and slots To insert the S8300 Media Server module Inserting the S8300 Media Server moduleTo insert a media module Inserting media modulesInserting a media module Attach ground conductorsGeneral grounding requirements Approved grounds To attach the ground wires Connect the safety groundTo connect power to the G350 Connect power to the G350Installation of the G350 Media Gateway Prepare configuration equipment Preparing for configurationPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration To connect and enable the modem Connecting the USB modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting a combined remote and on-site configuration Assist the configurationAssisting a remote configuration Assisting an on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connect the network Connecting devicesTo connect an IP telephone Connect IP telephonesConnect non-IP telephones and trunks Connecting an analog telephoneTo connect an analog telephone To connect a DCP telephone Connecting a DCP telephoneTo connect an E1/T1 trunk Connecting an analog trunkConnecting an E1/T1 trunk To connect an analog trunkTo connect an Isdn BRI trunk Connecting an Isdn BRI trunkOver-Voltage and Sneak-Current Protection Install circuit protectionConnect to the Wide Area Network WAN Connecting the G350 to the WANTo connect the WAN to the G350 Connecting an external router to the G350 Install the Coupled Bonding ConductorTo install the CBC To install the contact closure Install the Avaya Partner Contact Closure AdjunctTesting trunks After installationTest the installation Testing telephonesLSP failover testing Remove the installation equipmentG350 Media Gateway specifications Technical specificationsPower Cord Specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway