Avaya G350 manual Inserting the S8300 Media Server module, To insert the S8300 Media Server module

Page 25

Installing the Avaya G350 Media Gateway

Step 2: Install the media modules

Inserting the S8300 Media Server module

CAUTION:

Hold media modules only by the edges to avoid damage from static electricity. Do not touch the top or bottom of the circuit board. If possible, wear a wrist-strap and use an anti- static bag.

CAUTION:

The connector pins can be bent or damaged if the module is handled roughly, or if misaligned and then forced into position.

CAUTION:

Separate ESD paths to the chassis ground connect to the media modules at the spring- loaded captive screws. Use a screw driver to ensure the captive screws are securely tightened to prevent damage to the equipment.

The S8300 can only be inserted in slot V1 on the left side of the G350 Media Gateway.

To insert the S8300 Media Server module

1Remove the plate between slots V1 and V2, labelled “Remove before removing or inserting S8300 module.”

2Remove the blank plate from slot V1.

3Position the media module squarely before the V1 bay opening and engage both sides of the module in the interior guides.

4Slide the S8300 module slowly into the chassis, maintaining an even pressure to assure that the module does not become twisted or disengaged from the guides.

Figure 5: Inserting the S8300 media server module.

Installation of the G350 Media Gateway

25

December 2003

 

Image 25
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway About this book Downloading this book and updates from the WebOverview AudienceSecurity Alert Safety labels and security alert labelsTechnical assistance Related resourcesTrademarks Within the USSending us comments Full installation Installation workflowsBefore you start Gathering information Installation of a staged G350Staging Unpacking Environmental Verification Site requirementsRequired equipment Installation of the G350 Media Gateway Mount the G350 chassis Installing the Avaya G350 Media GatewayMounting the G350 in a rack Affixing a mounting bracket to the front of the G350 To mount the G350 in the rack To attach each mounting bracket to the G350Placing the G350 on a table Mounting the G350 on a wallTo affix brackets to the G350 for wall mounting To affix the feetCombination limitations Install the media modulesAllocating slots G350 front panel ports and slots To insert the S8300 Media Server module Inserting the S8300 Media Server moduleTo insert a media module Inserting media modulesInserting a media module Attach ground conductorsGeneral grounding requirements Approved grounds To attach the ground wires Connect the safety groundTo connect power to the G350 Connect power to the G350Installation of the G350 Media Gateway Prepare configuration equipment Preparing for configurationPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration To connect and enable the modem Connecting the USB modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting a remote configuration Assist the configurationAssisting an on-site configuration Assisting a combined remote and on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connect the network Connecting devicesTo connect an IP telephone Connect IP telephonesConnect non-IP telephones and trunks Connecting an analog telephoneTo connect an analog telephone To connect a DCP telephone Connecting a DCP telephoneConnecting an E1/T1 trunk Connecting an analog trunkTo connect an analog trunk To connect an E1/T1 trunkTo connect an Isdn BRI trunk Connecting an Isdn BRI trunkOver-Voltage and Sneak-Current Protection Install circuit protectionConnect to the Wide Area Network WAN Connecting the G350 to the WANTo connect the WAN to the G350 Connecting an external router to the G350 Install the Coupled Bonding ConductorTo install the CBC To install the contact closure Install the Avaya Partner Contact Closure AdjunctTest the installation After installationTesting telephones Testing trunksLSP failover testing Remove the installation equipmentG350 Media Gateway specifications Technical specificationsPower Cord Specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway