Avaya G350 manual Unpacking

Page 15

Before you start

Unpacking

Unpacking

The G350 chassis and accessories are shipped in a box. The package should contain the following items:

One empty Avaya G350 Media Gateway chassis, with blanking plates over empty module slots.

One accessories box, containing:

One power cord. If the power cord provided does not have the correct plug configuration needed in a particular country, see the power cord specifications in Appendix A, “Technical specifications”.

One flat RJ-45 to RJ-45 cable.

One RJ-45 to DB-9 cable adapter.

One RJ-45 to DB-25 cable adapter.

Two standard mounting brackets.

One mounting bracket with cable guides.

One Supplementary Ground Conductor

Nine 6-32 x 3/8 screws.

One 8-32 x 5/16 screw.

One washer.

Four rubber feet.

Documentation CD.

Release notes.

Media modules for connecting voice and data devices and outside lines are packaged and shipped in separate boxes. The Avaya Partner Contact Closure adjunct box, if ordered, is also packaged separately.

Before you begin the installation:

1Unpack the G350 and accessories.

2Unpack each media module.

CAUTION:

Wear an anti-static wrist ground strap whenever handling components of an Avaya G350 Media Gateway. Connect the strap to an approved ground, such as an unpainted metal surface.

3Check the contents of the packaging against the customer order.

4Cross-check the customer order with the planning documentation you have been given. Media modules, telephones and other equipment are listed on your planning and shipping documentation. Placement for the media modules and other equipment are also indicated.

5Verify that all necessary elements have been received and are in good condition. If there are missing or damaged elements, contact the supporting technician for instructions. The planning documentation will list contact information for the supporting technician and other key personnel.

If you have any questions about the equipment order, or if the equipment has been damaged, contact your supporting technician.

Installation of the G350 Media Gateway

15

December 2003

 

Image 15
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway Audience Downloading this book and updates from the WebAbout this book OverviewSecurity Alert Safety labels and security alert labelsWithin the US Related resourcesTechnical assistance TrademarksSending us comments Installation workflows Full installationBefore you start Installation of a staged G350 Gathering informationStaging Unpacking Environmental Verification Site requirementsRequired equipment Installation of the G350 Media Gateway Installing the Avaya G350 Media Gateway Mount the G350 chassisMounting the G350 in a rack Affixing a mounting bracket to the front of the G350 To mount the G350 in the rack To attach each mounting bracket to the G350To affix the feet Mounting the G350 on a wallPlacing the G350 on a table To affix brackets to the G350 for wall mountingInstall the media modules Combination limitationsAllocating slots G350 front panel ports and slots To insert the S8300 Media Server module Inserting the S8300 Media Server moduleTo insert a media module Inserting media modulesInserting a media module Attach ground conductorsGeneral grounding requirements Approved grounds To attach the ground wires Connect the safety groundTo connect power to the G350 Connect power to the G350Installation of the G350 Media Gateway Prepare configuration equipment Preparing for configurationPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration To connect and enable the modem Connecting the USB modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting a combined remote and on-site configuration Assist the configurationAssisting a remote configuration Assisting an on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connect the network Connecting devicesTo connect an IP telephone Connect IP telephonesConnecting an analog telephone Connect non-IP telephones and trunksTo connect an analog telephone To connect a DCP telephone Connecting a DCP telephoneTo connect an E1/T1 trunk Connecting an analog trunkConnecting an E1/T1 trunk To connect an analog trunkTo connect an Isdn BRI trunk Connecting an Isdn BRI trunkOver-Voltage and Sneak-Current Protection Install circuit protectionConnecting the G350 to the WAN Connect to the Wide Area Network WANTo connect the WAN to the G350 Install the Coupled Bonding Conductor Connecting an external router to the G350To install the CBC To install the contact closure Install the Avaya Partner Contact Closure AdjunctTesting trunks After installationTest the installation Testing telephonesLSP failover testing Remove the installation equipmentTechnical specifications G350 Media Gateway specificationsPower Cord Specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway