Avaya manual To attach each mounting bracket to the G350, To mount the G350 in the rack

Page 21

Installing the Avaya G350 Media Gateway

Step 1: Mount the G350 chassis

Figure 3: Attaching a mounting bracket with cable guides

To attach each mounting bracket to the G350:

1Position a bracket over the desired mounting position.

2Affix the bracket to the chassis with three of the nine 6-32 x 3/8 screws provided.

3Tighten with the screwdriver.

The G350 is held in place by mounting screws through the two mounting ears. To avoid balancing problems and cabling complications, the racks should be filled from the bottom; that is, mount units in the lower positions first.

Before mounting the G350, check for the following:

Ensure that the rack is bolted to the floor and is earthquake-protected, if required. If the rack is not securely fixed in place, do not proceed with the installation.

If the G350 is being mounted in a rack with other equipment already installed, the G350 must be positioned to avoid imbalance.

The G350 is shipped with 3 sets of four mounting screws. Choose the set of screws that match the screw holes in the rack being used.

The G350 weighs 22.5 pounds (10 kg) empty and between 33 and 35 pounds (between 15 and

16 kg) when equipped with media modules. Two people may be needed to mount the G350 Media Gateway in the rack.

To mount the G350 in the rack:

1Position the G350 in the rack. Ensure that there is adequate ventilation.

2Verify that the screw holes are aligned with the rack hole positions.

3Insert two mounting screws on each side.

4Tighten the mounting screws. Avoid overtightening.

5Verify that ventilation vents are not obstructed.

Installation of the G350 Media Gateway

21

December 2003

 

Image 21
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway About this book Downloading this book and updates from the WebOverview AudienceSecurity Alert Safety labels and security alert labelsTechnical assistance Related resourcesTrademarks Within the USSending us comments Installation workflows Full installationBefore you start Installation of a staged G350 Gathering informationStaging Unpacking Environmental Verification Site requirementsRequired equipment Installation of the G350 Media Gateway Installing the Avaya G350 Media Gateway Mount the G350 chassisMounting the G350 in a rack Affixing a mounting bracket to the front of the G350 To mount the G350 in the rack To attach each mounting bracket to the G350Placing the G350 on a table Mounting the G350 on a wallTo affix brackets to the G350 for wall mounting To affix the feetInstall the media modules Combination limitationsAllocating slots G350 front panel ports and slots To insert the S8300 Media Server module Inserting the S8300 Media Server moduleTo insert a media module Inserting media modulesInserting a media module Attach ground conductorsGeneral grounding requirements Approved grounds To attach the ground wires Connect the safety groundTo connect power to the G350 Connect power to the G350Installation of the G350 Media Gateway Prepare configuration equipment Preparing for configurationPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration To connect and enable the modem Connecting the USB modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting a remote configuration Assist the configurationAssisting an on-site configuration Assisting a combined remote and on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connect the network Connecting devicesTo connect an IP telephone Connect IP telephonesConnecting an analog telephone Connect non-IP telephones and trunksTo connect an analog telephone To connect a DCP telephone Connecting a DCP telephoneConnecting an E1/T1 trunk Connecting an analog trunkTo connect an analog trunk To connect an E1/T1 trunkTo connect an Isdn BRI trunk Connecting an Isdn BRI trunkOver-Voltage and Sneak-Current Protection Install circuit protectionConnecting the G350 to the WAN Connect to the Wide Area Network WANTo connect the WAN to the G350 Install the Coupled Bonding Conductor Connecting an external router to the G350To install the CBC To install the contact closure Install the Avaya Partner Contact Closure AdjunctTest the installation After installationTesting telephones Testing trunksLSP failover testing Remove the installation equipmentTechnical specifications G350 Media Gateway specificationsPower Cord Specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway