Avaya manual Installing the Avaya G350 Media Gateway, Mount the G350 chassis

Page 19

Installing the Avaya G350 Media Gateway

Step 1: Mount the G350 chassis

2 Installing the Avaya G350 Media Gateway

This chapter describes the physical installation. Perform the following steps in order:

1Step 1: Mount the G350 chassis

2Step 2: Install the media modules

3Step 3: Attach ground conductors

4Step 4: Connect power to the G350

The steps are described in the sections below.

When you have installed the chassis and media modules and connected the power, you can move on to Chapter 4, “Connecting devices”, and connect external devices to the G350.

Step 1: Mount the G350 chassis

Mount the G350 in one of the following scenarios:

In a rack

On a wall

On a table

CAUTION:

When handling any components of an S8300 Media Server or G350 Media Gateway, wear an anti-static wrist ground strap. Connect the strap to an approved ground such as an unpainted metal surface.

Mounting the G350 in a rack

The G350 mounts in a standard 19-inch rack.

If the G350 is to be mounted in a rack, you can fasten the G350 to the rack either at the front of the G350 or at the middle. In either case, mounting brackets must be attached to the G350.

There are two types of mounting brackets provided with the G350:

Without cable guides - two mounting brackets without cable guides are provided.

With cable guides - one mounting bracket with cable guides is provided. This bracket provides guides for electrical cables.

Mounting brackets without cable guides can be attached either to each side of the front of the G350 for fastening the unit to the rack at the front or to the middle of each side panel of the G350 for fastening the chassis to the rack at the middle.

Installation of the G350 Media Gateway

19

December 2003

 

Image 19
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway Audience Downloading this book and updates from the WebAbout this book OverviewSecurity Alert Safety labels and security alert labelsWithin the US Related resourcesTechnical assistance TrademarksSending us comments Full installation Installation workflowsBefore you start Gathering information Installation of a staged G350Staging Unpacking Environmental Verification Site requirementsRequired equipment Installation of the G350 Media Gateway Mount the G350 chassis Installing the Avaya G350 Media GatewayMounting the G350 in a rack Affixing a mounting bracket to the front of the G350 To mount the G350 in the rack To attach each mounting bracket to the G350To affix the feet Mounting the G350 on a wallPlacing the G350 on a table To affix brackets to the G350 for wall mountingCombination limitations Install the media modulesAllocating slots G350 front panel ports and slots To insert the S8300 Media Server module Inserting the S8300 Media Server moduleTo insert a media module Inserting media modulesInserting a media module Attach ground conductorsGeneral grounding requirements Approved grounds To attach the ground wires Connect the safety groundTo connect power to the G350 Connect power to the G350Installation of the G350 Media Gateway Prepare configuration equipment Preparing for configurationPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration To connect and enable the modem Connecting the USB modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting a combined remote and on-site configuration Assist the configurationAssisting a remote configuration Assisting an on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connect the network Connecting devicesTo connect an IP telephone Connect IP telephonesConnect non-IP telephones and trunks Connecting an analog telephoneTo connect an analog telephone To connect a DCP telephone Connecting a DCP telephoneTo connect an E1/T1 trunk Connecting an analog trunkConnecting an E1/T1 trunk To connect an analog trunkTo connect an Isdn BRI trunk Connecting an Isdn BRI trunkOver-Voltage and Sneak-Current Protection Install circuit protectionConnect to the Wide Area Network WAN Connecting the G350 to the WANTo connect the WAN to the G350 Connecting an external router to the G350 Install the Coupled Bonding ConductorTo install the CBC To install the contact closure Install the Avaya Partner Contact Closure AdjunctTesting trunks After installationTest the installation Testing telephonesLSP failover testing Remove the installation equipmentG350 Media Gateway specifications Technical specificationsPower Cord Specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway