Avaya manual Gathering information, Staging, Installation of a staged G350

Page 14

Before you start

Gathering information

Staging

If you are using this guide to take you through staging the G350, work through the guide as follows:

1Read Step 2: Install the media modules on page 23, and install the media modules in the G350 chassis.

2Read Step 4: Connect power to the G350 on page 31, and apply power to the G350.

3Have the G350 configured and tested by a supporting technician. Do not connect a modem for the configuration. Read Assisting an off-site configuration (staging) on page 41.

4Disconnect from the G350 any external equipment used in the configuration and testing process.

5Disconnect power from the G350 and pack it up with the media modules installed.

Installation of a staged G350

If you receive the G350 after staging, pre-configured with the media modules already installed, work through the guide as follows:

1Read Step 1: Mount the G350 chassis on page 19, and mount the G350 with the media modules already installed.

2Read Step 4: Connect power to the G350 on page 31, and apply power to the G350.

3Read Chapter 4, “Connecting devices” and connect devices to the G350.

4Read Chapter 5, “After installation” and test the installation.

Gathering information

Before you begin the installation, read the planning documentation.

The planning documentation provides you with information about:

What media modules you will be installing. Take note of whether or not you are installing an S8300 Media Server module. The installation process is different depending on whether or not you are installing an S8300.

Which voice devices and data devices need to be connected to the G350.

Whom to contact on site about delivery, system questions, or network concerns.

Whom to contact at your home office in case of questions.

Whether you need a special pass or an escort.

How to gain entrance to the installation location if it is locked.

Where to install equipment.

Where to find a telephone near the installation location.

14

Installation of the G350 Media Gateway

 

December 2003

Image 14
Contents Installation of the Avaya G350 Media Gateway Copyright 2003, Avaya Inc All Rights Reserved SOC/REN Declarations of Conformity Contents Preparing for configuration Technical specifications Installation of the G350 Media Gateway Overview Downloading this book and updates from the WebAbout this book AudienceSafety labels and security alert labels Security AlertTrademarks Related resourcesTechnical assistance Within the USSending us comments Before you start Installation workflowsFull installation Staging Installation of a staged G350Gathering information Unpacking Site requirements Environmental VerificationRequired equipment Installation of the G350 Media Gateway Mounting the G350 in a rack Installing the Avaya G350 Media GatewayMount the G350 chassis Affixing a mounting bracket to the front of the G350 To attach each mounting bracket to the G350 To mount the G350 in the rackTo affix brackets to the G350 for wall mounting Mounting the G350 on a wallPlacing the G350 on a table To affix the feetAllocating slots Install the media modulesCombination limitations G350 front panel ports and slots Inserting the S8300 Media Server module To insert the S8300 Media Server moduleInserting media modules To insert a media moduleAttach ground conductors Inserting a media moduleGeneral grounding requirements Approved grounds Connect the safety ground To attach the ground wiresConnect power to the G350 To connect power to the G350Installation of the G350 Media Gateway Preparing for configuration Prepare configuration equipmentPreparing a G350 without an S8300 for configuration Installation of the G350 Media Gateway December Preparing a G350 with an S8300 for configuration Connecting the USB modem To connect and enable the modemInstallation of the G350 Media Gateway Installation of the G350 Media Gateway December Assisting an on-site configuration Assist the configurationAssisting a remote configuration Assisting a combined remote and on-site configurationAssisting an off-site configuration staging Installation of the G350 Media Gateway Connecting devices Connect the networkConnect IP telephones To connect an IP telephoneTo connect an analog telephone Connecting an analog telephoneConnect non-IP telephones and trunks Connecting a DCP telephone To connect a DCP telephoneTo connect an analog trunk Connecting an analog trunkConnecting an E1/T1 trunk To connect an E1/T1 trunkConnecting an Isdn BRI trunk To connect an Isdn BRI trunkInstall circuit protection Over-Voltage and Sneak-Current ProtectionTo connect the WAN to the G350 Connecting the G350 to the WANConnect to the Wide Area Network WAN To install the CBC Install the Coupled Bonding ConductorConnecting an external router to the G350 Install the Avaya Partner Contact Closure Adjunct To install the contact closureTesting telephones After installationTest the installation Testing trunksRemove the installation equipment LSP failover testingPower Cord Specifications Technical specificationsG350 Media Gateway specifications Power Cord Specifications Index Installing the G350 chassis Installation of the G350 Media Gateway December Installation of the G350 Media Gateway