Nortel Networks n0060597 manual Pre-upgrade activities

Page 14

14 Chapter 2 Pre-upgrade activities

Change (or verify) DHCP subnet names: The BCM 4.0 system supports 4 to 12 characters for the DHCP subnet name, while BCM 3.6/3.7 supports more than 12 characters. If your BCM 3.6/3.7 system has multiple DHCP subnet names where the first 12 characters are identical, you must change one of the subnet names to make it unique - the first 12 characters of each subnet name must be unique before upgrading. In Unified Manager go to DHCP > RemoteScope to verify your DHCP subnet names.

If the subnet names in BCM 3.6/3.7 are longer than 12 characters, the first 12 characters are preserved while the remaining characters are truncated. As a result, it is possible to have two subnet names that are identical after the upgrade. If there are two identical names after the upgrade the DHCP Provider Agent removes one of the entries.

Optional – Obtain BCM Imaging Tool (BIT): If an upgrade failure is encountered and the system is unrecoverable, the BIT can be used to image the system back to the BCM 3.6/3.7 release level. Then you can restore the previously saved backup (BCM 3.6/3.7 backup) such that the system returns to its pre-upgrade state. When another maintenance window is found, you can try the upgrade again. For more information on BIT, refer to the BCM Imaging Tool User Guide.

Change administrator password to default value: You must ensure that your BCM system administrator account, ee_admin, is available and the password is set to the default value, PlsChgMe!, before performing this upgrade. After you change the password, perform a system reboot from the Unified Manager menu before you begin the upgrade. If your password is not changed to default, the upgrade will not proceed and you will be prompted to change the password at that time.

Obtain a valid keycode for the upgrade (BCM or SRG): Before beginning the upgrade, you must ensure that you have a valid keycode for your system. Use KRS to view the existing features for your site and generate a keycode file for your new BCM 4.0 (or SRG 1.5) system with the required features. Ensure the features include the upgrade to BCM 4.0 for a BCM 4.0 system and the upgrade to SRG 1.5 for an SRG 1.5 system. Place this keycode file on the management computer that you are using to perform the upgrade.

BCM 4.0 and SRG 1.5 use a more powerful keycode system, therefore you must generate a new keycode to upgrade your system to BCM 4.0 (or SRG 1.5). Previous BCM 3.6/3.7 and SRG 1.0 keycodes do not work for BCM 4.0 (or SRG 1.5).

Keycodes are specific to a release. The upgrade process requires a different keycode for BCM 3.6, BCM 3.7, and SRG 1.0. For example, you cannot use a BCM 3.7 keycode to upgrade a BCM 3.6 system to BCM 4.0.

If you obtained a keycode to perform beta testing of the upgrade, you must obtain a new keycode to run the released version of the upgrade.

For more information on keycodes, see the BCM 4.0 Keycode Installation Guide.

Disable firewall services: If you are using firewall services on your BCM 3.6/3.7 system, temporarily disable the firewall until the upgrade has been completed. You will re-enable the firewall as a post-upgrade task.

Ensure LAN1 port is active: The LAN1 port on the BCM 3.6/3.7 system must be available and active. Verify that the LAN 1 LED on the BCM main unit is solid green, or view the Status LEDs in Unified Manager (Diagnostics > System Status Monitor).

N0060597

Image 14
Contents Upgrade Guide Copyright 2006 Nortel Networks, All Rights Reserved How to get Help How to get Help N0060597 Contents Appendix a Troubleshooting Chapter Getting startedApplicable systems What’s new in BCMFirst step Using this upgrade guideNo longer supported by BCM 4.0 software Second step Final stepPre-upgrade activities Important information to note before attempting this upgradePre-upgrade tasks BCM system tasksDrive Label Type Size bytes Pre-upgrade activities Route Management computer tasks Record-keeping tasks Pre-upgrade activities N0060597 Upgrading to BCM 4.0 and SRG Upgrading the BCM400 Expansion GatewayPerforming the BCM 4.0 and SRG 1.5 upgrade Upgrading an SRG 1.0 system to SRGTo perform the BCM 4.0 and SRG 1.5 upgrade BCM Upgrade Wizard welcomeBCM Upgrade Checklist BCM Upgrade Wizard sign-in Upgrading to BCM 4.0 and SRG Final Confirmation Before Upgrade Begins BCM Upgrade Wizard progress Insert CD Final upgrade screen with green BCM status LEDs Upgrade Wizard BCM status indicators BCM Connection LEDs BCM ServicesUpgrading to BCM 4.0 and SRG N0060597 Post-upgrade activities BCM system tasksPost-upgrade activities Post-upgrade activities To install the new version of the client application Client upgrade tasksTo uninstall a client application Installing Reporting for Contact Center RCC To install RCCPost-upgrade activities N0060597 Hard disk upgrade Upgrade to BCM 4.0 through hard disk replacement To upgrade to BCM 4.0 through a hard disk replacementDealing with log files TroubleshootingDealing with condition messages Upgrading to BCM 4.0 after a failed pre-check or upgrade BCM Imaging Tool BITBIT recovery process prerequisites BIT recovery processCommon troubleshooting issues