2.5 Power circuit wiring diagrams

The single-wire diagrams for typical UPS installations are given in figures 9 to 15. The heavy lines represent the cables that must be connected

(see the table in the previous chapter for the required cross-sectional areas of the cables). Note:

for frequency converters, the input and output frequencies may be different (50 or 60 Hz);

for frequency converters without batteries, ignore the battery cubicles and the + and - cables shown in the diagram.

Special case:

The UPSs can be optionally supplied with the neutral conductor not interrupted by switches Q4S, Q3BP and Q5N.

Diagram for a single-unit or single modular UPS with common Mains 1 and 2

mains 2

mains 1

earth

rectifier-inverter cubicle

 

 

 

Q3BP

 

 

Q4S

static

 

earth

 

 

 

 

 

switch

 

 

Q1

rectifier

inverter

Q5N

load

 

 

charger

 

 

 

 

 

 

frames interconnections for earthing

battery cubicle

QF1 +

-

 

+

-

other battery

 

 

 

 

 

 

 

 

 

beside the

 

 

 

 

 

cubicles (if

 

 

earth

rectifier-inverter cubicle

 

 

 

 

 

applicable)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 9

Diagram for a single-unit or single modular UPS with common Mains 1 and 2

rectifier-inverter cubicle

 

 

 

 

 

Q3BP

 

mains

mains 2

 

 

 

 

earth

 

input

 

Q4S

static

 

 

 

 

 

 

 

 

 

switch

 

 

 

mains 1

Q1

rectifier

inverter

Q5N

load

 

 

 

 

charger

 

 

 

input

 

 

 

 

 

 

 

 

 

 

earth

battery cubicle

QF1 +

beside the

 

 

 

 

rectifier-inverter cubicle

 

 

-

frames interconnections for earthing

+ -

other battery

 

 

 

cubicles (if

 

 

 

applicable)

 

 

 

 

earth

Fig. 10

Diagram for a frequency converter with batteries

mains 1

earth

rectifier-inverter cubicle

 

 

 

 

 

 

 

 

Q1

rectifier

inverter

 

Q5N

load

 

 

 

 

 

charger

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

earth

 

 

 

 

 

frames interconnections for earthing

 

battery cubicle

QF1

+

-

+

-

other battery

 

 

beside the

 

 

 

 

 

 

cubicles (if

 

earth

rectifier-inverter cubicle

 

 

 

 

 

applicable)

 

 

Fig. 11

34006451EN/AC - Page 13

Image 13
Contents Mgetm GalaxyTM Installation manual34006451EN/AC Contents Characteristics common to all cubicles CharacteristicsCharacteristics of rectifier-inverter cubicles Static Switch CubicleCharacteristics of Static Switch Cubicles Rectifier-inverter cubicleElectrical parameters for Mains Electrical parameters for selecting protective devicesElectrical parameters for Mains 2 415 Rated Mains 1 current InverterParameters for single-unit UPS cables Electrical parameters for determining cable cross-sectionsInstallation with parallel UPSs with a centralised SSC Installation with parallel frequency convertersNF C 15-100 authorizes a maximum of 4 cables per phase Maintenance Bypass cubicle Mains Inverter Mains 1 mains Load Positioning the cubicles HandingSide clearances provided by the spacing uprights Rear FrontCubicle layout on false floor or normal floor figures 6, 7 Floor loads figureCubicle footpads Rear Connection via the bottomLayout for a single-unit UPS with one battery cubicle Rear Diagram for a frequency converter with batteries Power circuit wiring diagramsSpecial case Example of a 2 parallel UPS rectifier-inverters with SSC Diagram for a frequency converter without batteriesModular UPS cubicle External maintenance bypass cubicle Mounting of the left and right cubicles Cubicle mounting and connectionXMGD05 Internal connections between cubiclesXFGD06 General Connection of power circuitsLeft cubicle of single-unit or parallel UPS with SSC Cross-section AAXR1 XR8 Right cubicle of single-unit UPSXR9 XR2 XR5 XR3 XR6 XR4 XR7Front Rear Right cubicle of a parallel UPS with SSCXR2 XR5 XR3 XR6 XR4 XR7XR1 XR2 XR3 XR4 Connection of auxiliary circuits on the remote relay boardEmergency shutdown Connection to battery circuit breaker QF1Connections between Apoz boards Connections between rectifier-inverter cubiclesXM XM XM XM Misi Connections between Misi boards modular UPSsUPS Misi XR8 XR9 XR5 XR6 XR7 Acpz board of the Static Switch CubicleConnections Connection of the battery Temperature Monitor optionalXR2 XR1 Temperature Monitor base Temperature Monitor installation in a battery roomDimensions of the Temperature Monitor 75 x 75 x 21 mm Connection of the LED remote indications unit Final installation stepsRated inverter output kVA Maximum permissible current Mains 2 line protectionLeft cubicle Cubicle mountingQ4S XF1-XF2 XM1-XM2Front view Right cubicle of a 2000 kVA Static SwitchFront Left cubicle of a 2000 kVA Static SwitchRear Front view Details of earthing connections in the various cubicles 120 to 1200 kVA Static Switch CubiclesRectifier-inverter cubicle Inverter InputTele-Monitor unit KVA Static Switch CubiclesComz 34006451EN/AC 34006451EN/AC 34006451EN/AC 34006451EN/AC