APC 9000 Floor loads figure, Cubicle layout on false floor or normal floor figures 6, 7

Page 11

Installation

2.3Floor loads (figure 5)

the floor supports the weight of each cubicle via the four 60 mm diameter pads at the bottom of the feet screwed into the corners of the frame;

the exact locations of the footpads are indicated in the figure;

normally the cubicles do not have to be secured to the floor; the footpads nevertheless have holes with an average depth of 12 mm designed for the fitting of M16 anchor bolts;

to determine the stresses applied by the cubicle feet on the floor, divide the cubicle weight (see the first 3 tables of this manual) by the total area of the 4 footpads (110 cm2).

Cubicle footpads

rear

33

cubicle width

33

 

 

less 66 mm

 

 

33

 

33

four 60 mm dia.

 

 

 

footpads with

 

 

 

12 mm average

 

 

 

depth holes for

 

 

 

M16 anchor bolts

736

 

 

 

 

 

 

33

 

33

front

Fig. 5

2.4Cubicle layout on false floor or normal floor (figures 6, 7, 8)

the cubicles can be installed directly up against the rear wall;

an overall clearance of 400 mm must be left above the entire surface of the cubicles for ventilation;

a side clearance of 25 mm is provided by the vertical bars on the sides of the cubicles to allow door opening. For cubicles mounted side by side, the two adjacent bars ensure an inter-cubicle clearance of 50 mm;

a minimum clearance of 1000 mm is required in front of the cubicles to allow complete opening of the doors and easy access for maintenance work (replacement of subassemblies);

for extended battery backup times or high output systems, the UPS may have several battery cubicles (see the table at the end of the previous chapter). If this is the case, install the battery cubicles on the left side of the rectifier-inverter cubicle with the cubicle containing the battery circuit breaker QF1 closest to the rectifier-inverter cubicle (figure 7);

when an auxiliary cubicle is included in the UPS, it should be installed to the left of the battery cubicle(s);

connection via the bottom

The connection cables may be run in three ways:

in a cable trench running underneath the front of the cubicles (see trench dimensions and layout in figure 6),

under a false floor. A cutout must in this case be made in the floor for cable entry (see figure 6 for dimensions),

34006451EN/AC - Page 11

Image 11
Contents Mgetm GalaxyTM Installation manual34006451EN/AC Contents Characteristics common to all cubicles CharacteristicsRectifier-inverter cubicle Static Switch CubicleCharacteristics of rectifier-inverter cubicles Characteristics of Static Switch CubiclesRated Mains 1 current Inverter Electrical parameters for selecting protective devicesElectrical parameters for Mains Electrical parameters for Mains 2 415Parameters for single-unit UPS cables Electrical parameters for determining cable cross-sections NF C 15-100 authorizes a maximum of 4 cables per phase Installation with parallel frequency converters Installation with parallel UPSs with a centralised SSC Maintenance Bypass cubicle Mains Inverter Mains 1 mains Load Front HandingPositioning the cubicles Side clearances provided by the spacing uprights RearConnection via the bottom Floor loads figureCubicle layout on false floor or normal floor figures 6, 7 Cubicle footpads RearLayout for a single-unit UPS with one battery cubicle Rear Special case Power circuit wiring diagramsDiagram for a frequency converter with batteries Example of a 2 parallel UPS rectifier-inverters with SSC Diagram for a frequency converter without batteriesModular UPS cubicle External maintenance bypass cubicle Mounting of the left and right cubicles Cubicle mounting and connectionXFGD06 Internal connections between cubiclesXMGD05 Cross-section AA Connection of power circuitsGeneral Left cubicle of single-unit or parallel UPS with SSCXR2 XR5 XR3 XR6 XR4 XR7 Right cubicle of single-unit UPSXR1 XR8 XR9XR3 XR6 XR4 XR7 Right cubicle of a parallel UPS with SSCFront Rear XR2 XR5XR1 XR2 XR3 XR4 Connection of auxiliary circuits on the remote relay boardConnections between rectifier-inverter cubicles Connection to battery circuit breaker QF1Emergency shutdown Connections between Apoz boardsXM XM XM XM UPS Connections between Misi boards modular UPSsMisi Misi XR8 XR9 XR5 XR6 XR7 Acpz board of the Static Switch CubicleXR2 XR1 Connection of the battery Temperature Monitor optionalConnections Dimensions of the Temperature Monitor 75 x 75 x 21 mm Temperature Monitor installation in a battery roomTemperature Monitor base Connection of the LED remote indications unit Final installation stepsRated inverter output kVA Maximum permissible current Mains 2 line protectionXF1-XF2 XM1-XM2 Cubicle mountingLeft cubicle Q4SFront view Right cubicle of a 2000 kVA Static SwitchRear Front view Left cubicle of a 2000 kVA Static SwitchFront Inverter Input 120 to 1200 kVA Static Switch CubiclesDetails of earthing connections in the various cubicles Rectifier-inverter cubicleComz KVA Static Switch CubiclesTele-Monitor unit 34006451EN/AC 34006451EN/AC 34006451EN/AC 34006451EN/AC