APC 9000 installation manual Right cubicle of a 2000 kVA Static Switch, Front view

Page 33

Appendix

Right cubicle of a 2000 kVA Static Switch

cross-section AA

air extraction

front

air admission

air admission

connection from below

trough (if applicable)

front view

rear

 

 

 

 

 

 

A

 

 

 

on

 

 

 

 

 

 

off

 

 

 

 

 

 

Q4S

 

 

 

N

L1

L2

L3

 

 

 

 

 

 

 

 

 

 

 

on

 

 

 

 

 

 

off

 

 

 

 

 

 

Q3BP

 

 

 

 

mains 2

N

L1

L2

L3

 

 

 

 

 

 

 

 

 

 

 

on

 

 

 

 

 

 

off

 

 

 

 

 

 

Q5N

 

 

 

 

 

 

 

load

 

 

 

 

 

 

 

A

spacing uprights

power cable routing via the bottom

Cables connected by lugs to 5 x (5 x 100) mm copper terminals and 16 mm diameter holes.

Height of connections relative to floor:

mains 2 : 1400 mm;

load: 800 mm.

34006451EN/AC - Page 33

Image 33
Contents Mgetm GalaxyTM Installation manual34006451EN/AC Contents Characteristics common to all cubicles CharacteristicsCharacteristics of rectifier-inverter cubicles Static Switch CubicleCharacteristics of Static Switch Cubicles Rectifier-inverter cubicleElectrical parameters for Mains Electrical parameters for selecting protective devicesElectrical parameters for Mains 2 415 Rated Mains 1 current InverterParameters for single-unit UPS cables Electrical parameters for determining cable cross-sectionsInstallation with parallel frequency converters Installation with parallel UPSs with a centralised SSCNF C 15-100 authorizes a maximum of 4 cables per phase Maintenance Bypass cubicle Mains Inverter Mains 1 mains Load Positioning the cubicles HandingSide clearances provided by the spacing uprights Rear FrontCubicle layout on false floor or normal floor figures 6, 7 Floor loads figureCubicle footpads Rear Connection via the bottomLayout for a single-unit UPS with one battery cubicle Rear Power circuit wiring diagrams Diagram for a frequency converter with batteriesSpecial case Example of a 2 parallel UPS rectifier-inverters with SSC Diagram for a frequency converter without batteriesModular UPS cubicle External maintenance bypass cubicle Mounting of the left and right cubicles Cubicle mounting and connectionInternal connections between cubicles XMGD05XFGD06 General Connection of power circuitsLeft cubicle of single-unit or parallel UPS with SSC Cross-section AAXR1 XR8 Right cubicle of single-unit UPSXR9 XR2 XR5 XR3 XR6 XR4 XR7Front Rear Right cubicle of a parallel UPS with SSCXR2 XR5 XR3 XR6 XR4 XR7XR1 XR2 XR3 XR4 Connection of auxiliary circuits on the remote relay boardEmergency shutdown Connection to battery circuit breaker QF1Connections between Apoz boards Connections between rectifier-inverter cubiclesXM XM XM XM Connections between Misi boards modular UPSs MisiUPS Misi XR8 XR9 XR5 XR6 XR7 Acpz board of the Static Switch CubicleConnection of the battery Temperature Monitor optional ConnectionsXR2 XR1 Temperature Monitor installation in a battery room Temperature Monitor baseDimensions of the Temperature Monitor 75 x 75 x 21 mm Connection of the LED remote indications unit Final installation stepsRated inverter output kVA Maximum permissible current Mains 2 line protectionLeft cubicle Cubicle mountingQ4S XF1-XF2 XM1-XM2Front view Right cubicle of a 2000 kVA Static SwitchLeft cubicle of a 2000 kVA Static Switch FrontRear Front view Details of earthing connections in the various cubicles 120 to 1200 kVA Static Switch CubiclesRectifier-inverter cubicle Inverter InputKVA Static Switch Cubicles Tele-Monitor unitComz 34006451EN/AC 34006451EN/AC 34006451EN/AC 34006451EN/AC