APC 9000 installation manual Cubicle mounting, Left cubicle, Q4S, XF1-XF2 XM1-XM2

Page 32

Appendix

3.2 Cubicle mounting and connection for 2000 kVA Static Switch Cubicle

Cubicle mounting

move the cubicles to their operating location;

adjust the front foot pads so that the cubicles are vertical and their doors aligned.

Internal connections between cubicles

install and bolt the supplied fish-plates on the bars for the phases and neutral (L1, L2, L3, N) between the two cubicles (four bars in top and four bars in bottom);

connect the earth strap to the front uprights of both cubicles;

connect the connectors marked XM1 and XM2 from the left cubicle to the connectors marked XF1 and XF2

in the right cubicle.

left cubicle

right cubicle

 

K2S

L3

card cage

 

earth strap to be connected to the front uprights of both cubicles

 

 

 

on

 

 

 

off

 

 

 

Q4S

N

L1

L2

L3

 

 

 

 

 

on

 

 

 

off

 

 

 

Q3BP

 

XF1-XF2

 

 

XM1-XM2

 

 

 

on

 

 

 

off

 

 

 

Q5N

spacing

 

uprights

 

34006451EN/AC - Page 32

Image 32
Contents Installation manual Mgetm GalaxyTM34006451EN/AC Contents Characteristics Characteristics common to all cubiclesStatic Switch Cubicle Characteristics of rectifier-inverter cubiclesCharacteristics of Static Switch Cubicles Rectifier-inverter cubicleElectrical parameters for selecting protective devices Electrical parameters for MainsElectrical parameters for Mains 2 415 Rated Mains 1 current InverterElectrical parameters for determining cable cross-sections Parameters for single-unit UPS cablesNF C 15-100 authorizes a maximum of 4 cables per phase Installation with parallel frequency convertersInstallation with parallel UPSs with a centralised SSC Maintenance Bypass cubicle Mains Inverter Mains 1 mains Load Handing Positioning the cubiclesSide clearances provided by the spacing uprights Rear FrontFloor loads figure Cubicle layout on false floor or normal floor figures 6, 7Cubicle footpads Rear Connection via the bottomLayout for a single-unit UPS with one battery cubicle Rear Special case Power circuit wiring diagramsDiagram for a frequency converter with batteries Diagram for a frequency converter without batteries Example of a 2 parallel UPS rectifier-inverters with SSCModular UPS cubicle External maintenance bypass cubicle Cubicle mounting and connection Mounting of the left and right cubiclesXFGD06 Internal connections between cubiclesXMGD05 Connection of power circuits GeneralLeft cubicle of single-unit or parallel UPS with SSC Cross-section AARight cubicle of single-unit UPS XR1 XR8XR9 XR2 XR5 XR3 XR6 XR4 XR7Right cubicle of a parallel UPS with SSC Front RearXR2 XR5 XR3 XR6 XR4 XR7Connection of auxiliary circuits on the remote relay board XR1 XR2 XR3 XR4Connection to battery circuit breaker QF1 Emergency shutdownConnections between Apoz boards Connections between rectifier-inverter cubiclesXM XM XM XM UPS Connections between Misi boards modular UPSsMisi Misi Acpz board of the Static Switch Cubicle XR8 XR9 XR5 XR6 XR7XR2 XR1 Connection of the battery Temperature Monitor optionalConnections Dimensions of the Temperature Monitor 75 x 75 x 21 mm Temperature Monitor installation in a battery room Temperature Monitor base Final installation steps Connection of the LED remote indications unitMains 2 line protection Rated inverter output kVA Maximum permissible currentCubicle mounting Left cubicleQ4S XF1-XF2 XM1-XM2Right cubicle of a 2000 kVA Static Switch Front viewRear Front view Left cubicle of a 2000 kVA Static SwitchFront 120 to 1200 kVA Static Switch Cubicles Details of earthing connections in the various cubiclesRectifier-inverter cubicle Inverter InputComz KVA Static Switch CubiclesTele-Monitor unit 34006451EN/AC 34006451EN/AC 34006451EN/AC 34006451EN/AC