APC 9000 installation manual Connection of power circuits, General, Cross-section AA

Page 19

installation

2.7 Connection of power circuits

Before making connections, check that switches Q1, Q4S, Q3BP and Q5N are in the "open" position (toggle opposite the "O" mark).

General:

in the case of parallel-connected rectifier-inverter cubicles with SSC, switches Q4S and Q3BP are not included and mains 2 is connected to the Static Switch Cubicle. The other connections are the same;

for modular UPSs with an external maintenance bypass, switch Q3BP must be locked open;

the power cables for the connections between cubicles are not supplied;

open the doors and remove the lower terminal shields (secured by screws to the cubicle chassis) of the rectifier-inverter and Static Switch Cubicles;

connect the cables shown in heavy lines in the wiring diagrams shown previously to the terminals specified in the figures below;

each cubicle must be earthed;

the routing of the power cables is shown in the figures;

the auxiliary wiring is routed in troughs located nearby (not shown in the drawings);

outside the cubicles, separate the auxiliary wiring from the power cables;

all the cubicles must be interconnected for earthing, forming a mesh which is itself connected to the building structure and earthing electrode;

the connection drawings hereafter show the cubicles with doors open and terminal shields removed.

Left cubicle of single-unit or parallel UPS with SSC

cross-section AA

front view

air extraction

 

 

 

 

 

 

front

rear

 

 

 

A

 

 

 

 

 

 

 

 

rectifier

inverter

inverter

inverter

 

 

charger

stack

 

stack

stack

 

air

 

 

 

 

 

 

admission

 

 

 

 

 

 

 

 

 

 

FHCZ

 

 

 

 

 

 

board

 

 

 

 

off

 

 

 

 

transformer

 

on

Q1

 

 

 

 

 

 

 

 

battery

 

 

 

 

 

 

mains 1

 

L1 L2 L3

 

L+

L

 

mains 1

 

battery

 

 

 

air

 

 

 

 

 

 

admission

 

 

 

 

 

 

cable tie bar

 

 

 

 

 

 

connection

spacing

cable

 

A

 

from below

uprights

tie bar

 

 

 

 

 

trough (if applicable)

 

 

 

power cable routing

 

 

 

 

 

 

via the bottom

 

 

Cables connected by lugs to 100 x 8 mm copper terminals and 13 mm diameter holes.

Height of connections relative to floor:

mains 1: 450 mm;

battery: 480 mm.

34006451EN/AC - Page 19

Image 19
Contents Mgetm GalaxyTM Installation manual34006451EN/AC Contents Characteristics common to all cubicles CharacteristicsRectifier-inverter cubicle Static Switch CubicleCharacteristics of rectifier-inverter cubicles Characteristics of Static Switch CubiclesRated Mains 1 current Inverter Electrical parameters for selecting protective devicesElectrical parameters for Mains Electrical parameters for Mains 2 415Parameters for single-unit UPS cables Electrical parameters for determining cable cross-sectionsInstallation with parallel UPSs with a centralised SSC Installation with parallel frequency convertersNF C 15-100 authorizes a maximum of 4 cables per phase Maintenance Bypass cubicle Mains Inverter Mains 1 mains Load Front HandingPositioning the cubicles Side clearances provided by the spacing uprights RearConnection via the bottom Floor loads figureCubicle layout on false floor or normal floor figures 6, 7 Cubicle footpads RearLayout for a single-unit UPS with one battery cubicle Rear Diagram for a frequency converter with batteries Power circuit wiring diagramsSpecial case Example of a 2 parallel UPS rectifier-inverters with SSC Diagram for a frequency converter without batteriesModular UPS cubicle External maintenance bypass cubicle Mounting of the left and right cubicles Cubicle mounting and connectionXMGD05 Internal connections between cubiclesXFGD06 Cross-section AA Connection of power circuitsGeneral Left cubicle of single-unit or parallel UPS with SSCXR2 XR5 XR3 XR6 XR4 XR7 Right cubicle of single-unit UPSXR1 XR8 XR9XR3 XR6 XR4 XR7 Right cubicle of a parallel UPS with SSCFront Rear XR2 XR5XR1 XR2 XR3 XR4 Connection of auxiliary circuits on the remote relay boardConnections between rectifier-inverter cubicles Connection to battery circuit breaker QF1Emergency shutdown Connections between Apoz boardsXM XM XM XM Misi Connections between Misi boards modular UPSsUPS Misi XR8 XR9 XR5 XR6 XR7 Acpz board of the Static Switch CubicleConnections Connection of the battery Temperature Monitor optionalXR2 XR1 Temperature Monitor base Temperature Monitor installation in a battery roomDimensions of the Temperature Monitor 75 x 75 x 21 mm Connection of the LED remote indications unit Final installation stepsRated inverter output kVA Maximum permissible current Mains 2 line protectionXF1-XF2 XM1-XM2 Cubicle mountingLeft cubicle Q4SFront view Right cubicle of a 2000 kVA Static SwitchFront Left cubicle of a 2000 kVA Static SwitchRear Front view Inverter Input 120 to 1200 kVA Static Switch CubiclesDetails of earthing connections in the various cubicles Rectifier-inverter cubicleTele-Monitor unit KVA Static Switch CubiclesComz 34006451EN/AC 34006451EN/AC 34006451EN/AC 34006451EN/AC