APC 9000 installation manual Left cubicle of a 2000 kVA Static Switch, Rear Front view

Page 34

Appendix

Left cubicle of a 2000 kVA Static Switch

cross-section AA

air extraction

front

air

admission

air

admission

connection

from below

trough (if applicable)

rear

front view

 

 

 

 

 

A

 

 

 

K2S switch

 

 

 

 

 

 

 

 

 

ACPZ board

 

 

 

 

 

 

XM127 to 132

 

 

 

 

 

 

remote

N

L1

L2

L3

card cage

 

relay

 

board

 

 

 

 

 

 

XR7

XR4

 

 

inverter outputs

XR6

 

 

XR3

 

 

 

 

 

 

 

 

 

 

XR5

 

 

 

 

 

XR2

 

 

 

 

 

 

remote

 

 

 

 

XR9

XR1

 

 

 

 

XR8

relay

 

 

 

 

 

board

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

spacing

 

 

 

 

 

 

uprights

 

 

 

power cable routing via the bottom

Cables connected by lugs to 5 x (5 x 100) mm copper terminals and 16 mm diameter holes.

Height of connections relative to floor:

inverter outputs : 700 mm

remote relay board: 500 mm.

34006451EN/AC - Page 34

Image 34
Contents Installation manual Mgetm GalaxyTM34006451EN/AC Contents Characteristics Characteristics common to all cubiclesCharacteristics of Static Switch Cubicles Static Switch CubicleCharacteristics of rectifier-inverter cubicles Rectifier-inverter cubicleElectrical parameters for Mains 2 415 Electrical parameters for selecting protective devicesElectrical parameters for Mains Rated Mains 1 current InverterElectrical parameters for determining cable cross-sections Parameters for single-unit UPS cablesInstallation with parallel UPSs with a centralised SSC Installation with parallel frequency convertersNF C 15-100 authorizes a maximum of 4 cables per phase Maintenance Bypass cubicle Mains Inverter Mains 1 mains Load Side clearances provided by the spacing uprights Rear HandingPositioning the cubicles FrontCubicle footpads Rear Floor loads figureCubicle layout on false floor or normal floor figures 6, 7 Connection via the bottomLayout for a single-unit UPS with one battery cubicle Rear Diagram for a frequency converter with batteries Power circuit wiring diagramsSpecial case Diagram for a frequency converter without batteries Example of a 2 parallel UPS rectifier-inverters with SSCModular UPS cubicle External maintenance bypass cubicle Cubicle mounting and connection Mounting of the left and right cubiclesXMGD05 Internal connections between cubiclesXFGD06 Left cubicle of single-unit or parallel UPS with SSC Connection of power circuitsGeneral Cross-section AAXR9 Right cubicle of single-unit UPSXR1 XR8 XR2 XR5 XR3 XR6 XR4 XR7XR2 XR5 Right cubicle of a parallel UPS with SSCFront Rear XR3 XR6 XR4 XR7Connection of auxiliary circuits on the remote relay board XR1 XR2 XR3 XR4Connections between Apoz boards Connection to battery circuit breaker QF1Emergency shutdown Connections between rectifier-inverter cubiclesXM XM XM XM Misi Connections between Misi boards modular UPSsUPS Misi Acpz board of the Static Switch Cubicle XR8 XR9 XR5 XR6 XR7Connections Connection of the battery Temperature Monitor optionalXR2 XR1 Temperature Monitor base Temperature Monitor installation in a battery roomDimensions of the Temperature Monitor 75 x 75 x 21 mm Final installation steps Connection of the LED remote indications unit Mains 2 line protection Rated inverter output kVA Maximum permissible currentQ4S Cubicle mountingLeft cubicle XF1-XF2 XM1-XM2Right cubicle of a 2000 kVA Static Switch Front viewFront Left cubicle of a 2000 kVA Static SwitchRear Front view Rectifier-inverter cubicle 120 to 1200 kVA Static Switch CubiclesDetails of earthing connections in the various cubicles Inverter InputTele-Monitor unit KVA Static Switch CubiclesComz 34006451EN/AC 34006451EN/AC 34006451EN/AC 34006451EN/AC