Operation – Operation Procedures
How to turn load OFF/ON via the display interface
Disconnecting the UPS output to the load does NOT the total power off procedure if you need to
Turn Load OFF – How to disconnect the UPS output to the load equipment.
Press Use
Chrg 100%
Load 000%
xxxVin 000Vout x0Hz Runtime: 0hr 0m
Use |
|
|
| Press | Use |
|
|
|
Turn Load Off
If the UPS is running in parallel operation this procedure must be carried out on each UPS.
Control | Logging |
Status | Display |
Setup | Diags |
| Help |
Confirm:
Turn Load OFF
NO, Abort
YES, Turn Load OFF
Press
Press
Turn load ON – How to connect the UPS output to the load equipment.
Press Use
Chrg 100%
Load 000%
xxxVin 000Vout x0Hz Runtime: 0hr 0m
Press
Control Logging
Status Display
Setup Diags
Help
Use |
|
|
| Press | Use |
|
|
|
Turn Load On
Confirm:
Press
If the UPS is running in parallel operation this procedure must be carried out on each UPS.
Turn Load OFF
NO, Abort
YES, Turn Load ON