APC 10-40 KVA 380/400/415 V manual

Page 13

Note: The U-shaped interconnection brackets are 1-2 mm higher than the opening below the enclosure to inactivate the casters. Therefore, the enclosure must be tilted when placing the U- shaped interconnection brackets under the enclosure.

3. In each side of the same enclosure insert a maximum of nine and a minimum of two M8 screws (not provided) through holes in the bottom of the enclosure and through holes in the U-shaped floor anchoring brackets, and into the pre-drilled floor holes.

Note: See “Prepare for Floor-Anchoring

(optional)” on page 2 if the floor has not been prepared for anchoring.

4.Fasten the screws.

5.Move the adjacent enclosure on its casters close to the enclosure with the U- shaped floor anchoring brackets.

Note: If the additional enclosure is on

its levelling feet, use a forklift or pallet jack to move it into position.

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

9

Image 13
Contents Installation Page Contents Post-Installation Checklist Important Safety Instructions Save These Instructions SafetySystem arrangements Prepare for Floor-Anchoring optionalFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Remove the front panel Prepare for CablesRemove the top cover Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Install isolators Connect Power in Installations with BusbarsRun the Cables Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Install power cables Connect Power in Installations with CablesFeed the cable up Connect Communication Cables Connect the EPO Connect the EPO to the UPS and the XR Battery EnclosureLevel the enclosures Final Mechanical AssemblyInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Battery voltage and current SpecificationsTorque specification Recommended cable sizesPost-Installation Checklist Page Page Page 11/2009 990-1740D-001