APC 10-40 KVA 380/400/415 V Prepare for Cables, Remove the front panel, Remove the top cover

Page 9

Prepare for Cables

Remove the front panel

1.Turn the screw to the right to the unlocked position.

2.Pull the top of the front

panel away from the

UPS.

3. Lift the front panel free of the two slots at the bottom of the enclosure.

4.Lift the battery compartment cover free

of the two slots at the bottom of the enclosures (only in Japanese configurations).

Remove the top cover

1. Loosen the six screws of the top

UPS front view

XR Battery

cover (four at the front and two at

 

Enclosure

the back).

 

 

2. Lift up from the back and push forward to free the cover.

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

5

Image 9
Contents Installation Page Contents Post-Installation Checklist Important Safety Instructions Save These Instructions SafetySystem arrangements Prepare for Floor-Anchoring optionalFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Prepare for Cables Remove the front panelRemove the top cover Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Connect Power in Installations with Busbars Install isolatorsRun the Cables Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Install power cables Connect Power in Installations with CablesFeed the cable up Connect Communication Cables Connect the EPO Connect the EPO to the UPS and the XR Battery EnclosureLevel the enclosures Final Mechanical AssemblyInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Battery voltage and current SpecificationsTorque specification Recommended cable sizesPost-Installation Checklist Page Page Page 11/2009 990-1740D-001