APC 10-40 KVA 380/400/415 V manual Post-Installation Checklist

Page 28

Post-Installation Checklist

Use the following checklist to verify that the XR Battery Enclosure has been installed correctly:

Ensure that all busbars/cables between the XR Battery Enclosure(s) and the UPS are correctly installed.

Ensure that the DC breaker (if available) in the Battery Enclosure is in the OFF or STAND-BY position.

Install the enclosure plates.

Note: If a problem occurs, call Customer Support (see the back cover).

See also the Operation Manual located in the documentation storage area behind the front panel of the UPS and XR Battery Enclosure(s).

24

Smart-UPS VT ® 10-40 kVA 380/400/415 V, 208/220 V, 200/208 V Battery Installation

Image 28
Contents Installation Page Contents Post-Installation Checklist Safety Important Safety Instructions Save These InstructionsPrepare for Floor-Anchoring optional System arrangementsFour one in each corner. Recommended floor bolt size M8 Model width 352 mm 13.85 Remove the front panel Prepare for CablesRemove the top cover Remove the cable landing cover and bottom plates Remove the XR Battery Modules Shaped floor Page Insert Install isolators Connect Power in Installations with BusbarsRun the Cables Install busbars UPS XR1 XR2 XR2 XR1 UPS See Connect the EPO on Connect Power in Installations with Cables Install power cablesFeed the cable up Connect Communication Cables Connect the EPO to the UPS and the XR Battery Enclosure Connect the EPOFinal Mechanical Assembly Level the enclosuresInstall battery-securing and floor-anchoring brackets Reinstall the Enclosure Plates Specifications Battery voltage and currentTorque specification Recommended cable sizesPost-Installation Checklist Page Page Page 990-1740D-001 11/2009